My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1986-014
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1986
>
Res 1986-014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2007 11:10:14 AM
Creation date
8/27/2007 11:10:13 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1986-14
Date
2/10/1986
Volume Book
77
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> C. Report on Recommendation: Following the Preliminary <br /> Study, the Engineer shall submit a report to the Owner rendering a <br /> preferred recommendation as to the course of action the Owner <br /> should take regarding further action involving design and <br /> construction or rehabilitation of deficiency rectification. <br /> Preliminary maps, sketches or layouts will be provided by Engineer <br /> to indicate the existing situation and recommendation. <br /> 1.1.2 Notification of Desired Action: At the Owner's <br /> discretion and upon written notice by the Owner, the Engineer <br /> shall accomplish the following tasks: <br /> A. Option I - No Corrective Action: Upon completion of the <br /> Preliminary Investigation and Coordination Phase of the University <br /> Interceptor Project, proceed with the design of the University <br /> Interceptor Project as defined by Section 1.2 of this Agreement <br /> without consideration of any potential changes for the Main <br /> Interceptor Project. <br /> B. Option II - Corrective Action: Upon receiving from the <br /> Owner written approval of the recommended deficiency <br /> rectification, the Engineer shall proceed with the Preliminary, <br /> Design and Construction Phases of the Main Interceptor Project as <br /> defined below: <br /> 1. Preliminary Phase <br /> For the Preliminary Investigation and Coordination <br /> Phase, the Engineer shall perform the services as defined under <br /> Section 1.2.1 of this Agreement, except as noted below: <br /> (a) Alternate alignments will not be investigated <br /> except by agreement with Owner. <br /> (b) Alternate solutions will not be investigated beyond <br /> those described in the Preliminary Design Report. <br /> (c) Preliminary layouts, maps and sketches will not be <br /> provided for alternate alignments. <br /> 2. Design Phase <br /> For the Design, Plans and Specifications Phase, Designs, <br /> Plans and Specifications will be prepared for the reco~nended <br /> improvements as described by the Design Report. The services <br /> involved shall be as defined under Section 1.2.2 of this <br /> Agreement. <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.