My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1986-014
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1986
>
Res 1986-014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2007 11:10:14 AM
Creation date
8/27/2007 11:10:13 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1986-14
Date
2/10/1986
Volume Book
77
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> preparing Design, Plans and Specifications. The Design Report <br /> shall include the following: <br /> 1. Preliminary layouts, maps and sketches, design flows, <br /> population equivalents, or LUE's. <br /> 2. Detailed cost estimates of the probable Project <br /> Construction cost for the proposed alignment, and an estimated <br /> schedule for completion of design and construction. <br /> 3. Recommended improvements in sufficient detail to clearly <br /> indicate the problems involved and the alternative solutions <br /> available to the Owner, including the Engineer's preferred <br /> recommendation. <br /> 4. Submit to the Owner four (4) copies of the Design Report <br /> including layouts, sketches and cost estimates. <br /> 5. Obtain Owner1s written authorization to proceed with <br /> design phase based on the results of the Design Report, amended as <br /> necessary following Owner's review. <br /> 1.2.2 Design Phase <br /> A. Design Plans and Specifications: Designs, Plans and <br /> Specifications will be prepared for the recommended improvements <br /> as described in the Design Report. The Design, Plans and <br /> Specifications phase will include the following: <br /> 1. Attend and arrange for two (2) conferences with <br /> representatives of the Owner for the purposes of explanation of <br /> completed design work activities and determination of the <br /> scheduled accomplishment of activities. <br /> 2. Establish the scope, and advise the Owner of any <br /> additional soil and foundation investigations, or any tests which, <br /> in the opinion of the Engineer, may be required for the proper <br /> execution of the Projects. <br /> 3. Design the profile and finalize sizing of the <br /> interceptor. Prepare plan and profile sheets (horizontal 1"=40', <br /> vertical 1"=51) on dual plan/profile sheets. Design two diversion <br /> structures for use for diversion of wastewater flows into the <br /> proposed new interceptor. <br /> -5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.