My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1986-045
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1986
>
Res 1986-045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2007 11:51:25 AM
Creation date
8/27/2007 11:51:25 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
1986-45
Date
4/21/1986
Volume Book
78
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> The rating system, based on the four criteria, will be as follows: <br /> 1. UNSERVED COUNTY - 10 points. <br /> The proposed construction project is in a county presently without <br /> public library service, or in a county which has established service in <br /> the past three years. <br /> 2. TYPE OF CONSTRUCTION PROJECT - 25 point maximum. <br /> A. Construction of a new central library facility 25 points <br /> or purchase of an existing building to be converted <br /> to a central library facility. <br /> B. Addition to an existing central library facility. 20 points <br /> C. Construction of a new branch library facility or 15 points <br /> purchase of an existing building to be converted <br /> to a branch library facility. <br /> D. Remodeling of an existing library building. 5 points <br /> 3. LIBRARY SPACE NEEDS - 50 point maximum. <br /> To what extent does the combined gross square footage of existing <br /> library facilities (main, branches) fall short of the Texas Library <br /> Association standard? <br /> A. 0 - 10 percent of standard 50 points <br /> B. 11 - 20 percent of standard 45 points <br /> C. 21 - 30 percent of standard 40 points <br /> D. 31 - 40 percent of standard 35 points <br /> E. 41 - 50 percent of standard 30 points <br /> F. 51 - 60 percent of standard 25 points <br /> G. 61 - 70 percent of standard 20 points <br /> H. 71 - 80 percent of standard 15 points <br /> I. 81 - 90 percent of standard 10 points <br /> J. 91 - percent of standard 5 points <br /> 4. FUNDING AVAILABLE - 40 point maximum. <br /> What percentage of the project's total estimated cost to be paid for <br /> with local funds is available at the time of preapplication? <br /> A. 90 - 100 percent of local funding available 40 points <br /> ß. 75 - 89 percent of local funding available 30 points <br /> C. 50 - 74 percent of local funding available 20 points <br /> D. 25 - 49 percent of local funding available 10 points <br /> E. a - 24 percent of local funding available 5 points <br /> -5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.