My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1986-061
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1986
>
Res 1986-061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2007 1:15:44 PM
Creation date
8/27/2007 1:15:44 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1986-61
Date
5/19/1986
Volume Book
79
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> -3- <br /> 3.2 PHASE 1 - PRELIMINARY <br /> 3.2.1 Attend conferences with the OWNER and other interested <br /> parties regarding the PROJECT. <br /> 3.2.2 Inspect and eval uate existing facilities, gather and <br /> review existing data. <br /> 3.2.3 Develop a prelimlnary design for proposed improvements <br /> of the PROJECT with sketches necessary to describe the proposed <br /> improvements in their approximate locations for the OWNER's approval. <br /> 3.2.4 prepare a statement of the CONSULTANT's opinion of <br /> construction costs based upon the preliminary designs developed. The <br /> CONSULTANT's opinion of the construction cost will be based upon prices <br /> available at the time of preparation, without consideration of any <br /> inflationary increase in costs. The CONSULTANT will not be required to <br /> guarantee the accuracy of the estimates. <br /> 3.2.5 If required, establish the scope of needed land field <br /> survey information~ and when authorized by the OWNER, to arrange for <br /> such work to be done for the OWNER's account, as set forth in Article <br /> 5, Paragraph 5.3. <br /> 3.3 PHASE 2 - DESIGN <br /> Upon receipt of the OWNER's written authorization to implement <br /> Phase 2 and to proceed with final design and preparation of contract <br /> drawing sand specifications, the CONSULTANT shall: <br /> 3.3.1 Establish the scope and advise the OWNER of any soil and <br /> foundations investigatlon, or of any other special surveys and tests, <br /> which in the opinion of the CONSULTANT may be required for design: and <br /> when authorized by the OWNER, arrange for such work to be done for the <br /> OWNER's account, as set forth in Article 5, Paragraph 5.3. <br /> 3.3.2 Furnish to the OWNER, where required by the <br /> circumstances of the assignment, the engineering data necessary for <br /> applications for routine permits required by local, state, and Federal <br /> authorities. <br /> 3.3.3 prepare detailed contract drawings on drafting vellum or <br /> mylar film, and/or photographic reproducible mylar film, and prepare <br /> the specifications and contract documents for construction of the <br /> PROJ ECT. <br /> 3.3.4 Whenever preparation of detailed plans is approximately <br /> 60% complete, the CONSULTANT shall: <br /> (a) Furnish three ( 3) copies of all contract drawing s and <br /> contract documents and specifications to the OWNER, and two <br /> (2) copies of all contract drawings to the Federal Aviation <br /> Administration for preliminary review and comments; <br />
The URL can be used to link to this page
Your browser does not support the video tag.