Laserfiche WebLink
;;p HALFF <br />C. Design the collection system (inlets) and the conveyance system (pipes). <br />D. Attend design review meetings with the city staff and stakeholders. <br />E. Finalize plans and profiles, including any required standard or special details. <br />F. Prepare opinion of probable cost. <br />G. Prepare specifications <br />H. Traffic control plans <br />Old RR 12—Design—Option 1 <br />Page 8 <br />