My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1986-093
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1986
>
Res 1986-093
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2007 3:17:14 PM
Creation date
8/27/2007 3:17:14 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1986-93
Date
8/11/1986
Volume Book
81
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> payment l.n the amount certified. However, the issuance of a <br /> Certificate for Payment shaLL not be a representation that the <br /> ARCHITECT has made any exam1.nat1.on to ascerta1.n how and for what <br /> purpose the Contractor has used the monies pa1.d on account of the <br /> Contract Sum. <br /> 1.5.9 The ARCHITECT shaLL have authority to reJect Work which does <br /> not conform to the Contract Documents. Whenever, in the ARCHITECT's <br /> reasonable opin1.on, it is necessary or advisable for the proper <br /> implementat1.on of the l.ntent of the Contract Documents, ana with the <br /> approval of the OWNER, the ARCHITECT will have authority to requ1.re <br /> speciaL l.nspection or testing of the Work l.n accordance w1.th the <br /> prov1.sions of the Contract Documents, whether or not such Work be then <br /> fabricated, l.nstallea or completed. The ARCHITECT shaLL monitor and <br /> reV1.ew the work ana results of aLL testing labOrator1.es as required by <br /> OWNER. <br /> 1.5.10 The ARCHITECT shalL reV1.ew ana make aLL aec1.s1.ons regara1.ng <br /> the approva.l or tak1.ng of other appropr1.ate act1.on upon the <br /> Contractor's submittals such as Shop Draw1.ngs, Product Data ana <br /> SampLes, SChedU.le of Values and progress schedule. Such action shaLL <br /> be taken with reasonabLe promptness, but generaLLy not to exceed <br /> fifteen (15) days or such period of t1.me which WiLL not cause delay of <br /> the project( s). <br /> 1.5.11 The ARCHITECT shaLL prepare Change Orders for the OWNER I S <br /> approval ana execut1.on in accordance with the Contract Documents, out <br /> shalL not l.ssue change orders not prev1.ously approved in writing by <br /> OWNER, and no course of conduct on the part of ARCHITECT or OWNER shaLL <br /> act to amend, wa1.ve or alter this prov1.sion. <br /> 1.5.12 The ARCHITECT shalL cona uct professional l.nspect1.ons to <br /> aetermine the Dates of Substantial Completion ana f1.nal completion, to <br /> evaluate the Work for acceptable conformance with the Contract <br /> Documents ana in 11.ght of any subsequent tests performed as describea <br /> l.n Sect1.on 1.5.8 hereof, to ver1.fy that any minor aeviat1.ons from the <br /> Contract Documents as described l.n Section 1.5.8 hereof have been <br /> corrected and that the reasons for any spec1.f1.c qualifications l.n any <br /> ana all previous Cert1.ficates For Payment as described in Section 1.5.8 <br /> hereof are e1.ther no .longer val1.d or the conaition(s) ana/or probLem(s) <br /> have been corrected; shall rece1.ve ana review written warrant1.es and <br /> -6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.