My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1985-021
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1985
>
Res 1985-021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2007 3:53:08 PM
Creation date
8/28/2007 3:53:08 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1985-21
Date
3/4/1985
Volume Book
70
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> with findings and recommendations to the City <br /> Council. <br /> i. Additional Services: . The Engineer shall <br /> perform such additional services as requested <br /> and authorized in writing by the City Manager. <br /> 2. Design and Construction Phase of Project. The Design and <br /> Construction Phase of the Project will be negotiated by the City with <br /> the Engineer before, at or near the conclusion of the Preliminary Phase <br /> of the Project. <br /> C. Character and Extent of Services by City. The Ci ty shall <br /> render engineering services which include the following: <br /> a. City will identify significant point source flows close <br /> into and upstream of the project study sewer line. <br /> b. City will provide flow data to Engineer to assist <br /> Engineer in establishing inflow/infiltration levels. <br /> c. City will provide soils information to Eng ineer to <br /> assist Engineer in establishing ground water levels and <br /> soil characteristics. <br /> d. City will verify invert elevations to all manholes <br /> between L.B.J. and Sessoms intersection to the Main Lift <br /> Station. <br /> e. City will provide verification of sewer line sizes, <br /> number of lines in and out of manholes, manhole full line <br /> elevations in and full line elevations out, and <br /> construction material and condition of manholes. <br /> f. City will provide as-built drawings of the project study <br /> sewer line and the downstream sewer line. <br /> g. City will provide population and land use projections for <br /> the service area for existing and future use. <br /> h. The City shall perform such additional services as <br /> requested in writing by Engineer and agreed to by City. <br /> D. Compensation to Engineer. The CMner agrees to pay the <br /> Engineer for all professional services rendered under this Contract in <br /> accordance with the following schedule: <br /> STAFF MEMBERS: Sa.lary Cost Times Multiplier of 2.3 <br /> Sa.lary Cost is defined as the cost of salaries of engineers, <br /> draftsmen, stenographers, surveymen, clerks, laborers, etc. , <br /> for time directly chargeable to the project, plus social <br /> security contributions, unemployment compensation insurance, <br />
The URL can be used to link to this page
Your browser does not support the video tag.