Laserfiche WebLink
<br /> Task 220. Collect Missing Data. <br /> He will monitor the progress of the data collection tasks <br /> and assimilate and evaluate all additional collected data. The data <br /> collection will be carefully coordinated with the City Staff to pro- <br /> duce the da ta in such a form that it will not enly meet the need of <br /> Phase II, but will also provide a permanent record or operating tool <br /> for the City. <br /> PHASE III - WASTEWATER SYSTEM ANALYSIS <br /> Following the collection of all data, the detailed scope of the <br /> Phas~ III study will be itemized. to fit the available data and to <br /> satisfy the specific needs of the San Marcos system. A generalized <br /> list of work tasks required for the analysis follows. This work task <br /> list will be tailored to fit the actual work required to analyze the <br /> San Marcos system. <br /> Task 310. De fine Project Area and Divide into Subbasins. <br /> - - <br /> In conjunction with City staff, the project area will be <br /> defined. Using topographical maps and sewer plans, the areas tribu- <br /> tary to present and future trunks will be shown. <br /> Task 320. Disaggregate Population ÈX. Subhasin <br /> Based on the subbasins defined above and on existing and <br /> future population projections, the present and future population will <br /> be divided among the defined subbasins. Population estimates will be <br /> based upon the latest projection figures used by the City Planning <br /> Department, or if necessary, will be generated in this study. <br /> Task 330. Disaggregate Water Use ÈX. Subbasins. <br /> ~'¡a ter demands for existing and future populations, will be <br /> disaggregated to the defined subbasins. <br /> Task 340. Disaggregate Land Use ~ Subbasin. <br /> To obtain an indication of future industrial growth, as well <br /> as to confirm population densities. land use will be disaggregated to <br /> the defined subbasins. <br /> 20 <br />