My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2014-137/Kimley-Horn Professional Engineering Services Contract for Crystal Clear CCN waterline projects
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2014
>
Res 2014-137/Kimley-Horn Professional Engineering Services Contract for Crystal Clear CCN waterline projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 4:02:32 PM
Creation date
10/13/2014 10:25:15 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2014-137
Date
10/6/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT A <br />CITY OF SAN MARCOS <br />CRYSTAL CLEAR CCN WATER LINE IMPROVEMENTS PROJECT <br />SCOPE OF SERVICES <br />b. 60 %: KIMLEY -HORN will provide two (2) hard copies of 11" x 17" plan sets and one (1) <br />pdf electronic copy. At a minimum, the plan set will contain the following: <br />i. Cover Sheet <br />ii. Project Layout Sheet: KIMLEY -HORN will provide a layout of the project with <br />plan sheet references. <br />iii. Water Line Plan and Profile Sheets: Estimated Number of Sheets — thirteen (13). <br />iv. Sidewalk Plan and Profile Sheets (W. De Zavala site): Estimated Number of <br />Sheets — one (1). <br />V. List of Standard Details: City of San Marcos details will be used where available. <br />City of Austin details will be used otherwise. <br />vi. List of Standard Specifications: City of San Marcos Division 1 specifications will <br />be used. City of Austin standard specifications will be used. <br />vii. Project Specific/Special Specifications <br />viii. Project Specific/Special Details <br />ix. Engineer's OPCC. <br />X. Construction Project Schedule: KIMLEY -HORN will develop a Construction <br />Schedule for the project consisting of design, bid and construction phases. The <br />schedule will be updated during design. <br />c. 60% Comment Response Letter. <br />d. 90 %: KIMLEY -HORN will provide two (2) hard copies of 11" x 17" plan sets and one (1) <br />pdf electronic copy. The plan set will also contain the following: <br />i. Cover Sheet <br />ii. Project Layout Sheet <br />iii. Notes and Quantities <br />iv. Water Line Plan or Plan and Profile Sheets: Estimated Number of Sheets — <br />thirteen (13). <br />V. Sidewalk Plan and Profile Sheets (W. De Zavala site): Estimated Number of <br />Sheets — one (1). <br />vi. Traffic Control Standard Details <br />vii. Erosion Control Plan and Details <br />viii. Details <br />1H <br />
The URL can be used to link to this page
Your browser does not support the video tag.