My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2007-189
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2007
>
Res 2007-189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2008 2:47:20 PM
Creation date
11/7/2007 9:45:59 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2007-189
Date
11/5/2007
Volume Book
173
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1.1.4 No work under this Agreement will be subcontracted by the Engineer without prior <br />written approval from the City. Any work or services subcontracted under this Agreement wIll <br />be specIfied by separate written Agreement and will be subject to each provision of this <br />Agreement. <br /> <br />1.1.5 Any provIsIons in this Agreement pertainIng to the CIty'S review, approval and/or <br />acceptance of wntten matenals prepared by the Engineer and/or its subconsultants, contractors, <br />and subcontractors in connection with this Agreement will not diminish the Engineer's <br />responsibility for the materials. <br /> <br />1.1.6 Engineer will perform all of its servIces in coordInation with the City. The Engineer will <br />advise the City of data and information the Engineer needs to perform its services and the <br />Engineer will meet wIth CIty representatIves at mutually convenient tImes to assemble this data <br />and information. <br /> <br />1.2 TASK 1 - PROJECT MANAGEMENT <br /> <br />The Engineer will: <br /> <br />1.2.1 Staff Management and Task CoordinatIon - Assemble a Project team compnsed of the <br />City's representatives and the EngIneer's representatives. The Engineer will meet with the <br />Project team to set the desIgn and production schedule and parameters for all subsequent work, <br />to venfy the components within which all Project participants must perform, and to identify all <br />parties and significant deadlInes involved in the comprehensive schedule strategy. Based on this <br />information, the EngIneer will prepare a detailed schedule of its work for the Project addressing <br />each component of the work to be done, indicating the points of involvement of all project <br />participants. Prior to the construction phase, the Engineer will superVIse the project staff, <br />conduct monthly project staff coordination meetings as required, document meeting deCIsions <br />and action items, and assIgn activities to team members. In additIon, the Engineer will conduct <br />weekly progress meetIngs between the proJect team and the Contractor once the construction <br />contract is executed. <br /> <br />1.2.2 MonItor Proiect Progress - Monitor the Project progress, includtng work completed, work <br />remaining, budget expended, schedule, estImated cost of work remaining, and estimated cost at <br />completIon. The Engineer WIll monitor proJect activities for potential changes; and will <br />anticipate changes when possible, and, WIth City approval, modIfy project tasks, budgets, and <br />approach as needed. <br /> <br />1.2.3 Proiect Qualitv Control - Perform project quality control reviews of all deliverables on <br />the Proj ect. <br /> <br />1.2.4 Assist the City in connection WIth the City's responsibility for filing documents required <br />for the approval of governmental authorities haVIng jurisdiction over the Project. <br /> <br />1.2.5 Meet with the City's Project Manager periodically or as needed to update the City on the <br /> <br />Wet Weather hnprovements Project - CH2M Hill <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.