Laserfiche WebLink
\Ir. Tony Buonodono, P1?, PMP <br />AG1413700 <br />June 13, 2014 (Revised October 14, 2014) <br />of test results, engineering analyses and report preparation will take approximately four weeks after <br />completion of fieldwork. <br />Construction Material Testing Services <br />Our fee estimate does not include any allowance for performing construction material testing during <br />the construction phase. A separate proposal will be provided for these services in the future. <br />Sample Retainage <br />Soil samples will be retained in the climate controlled storage facility for a period of 30 days <br />following the final report, and at that time Parsons may extend the storage time if necessary for an <br />additional fee. <br />Invoices <br />Charges on the project will be invoiced monthly and terms are net 30 clays. <br />If this proposal meets with your approval, please sign and complete the indicated spaces below and <br />forward a copy of the proposal to us. <br />Sincerely, <br />HVJ ASSOCIATES, INC. <br />j/L4,, "41-X� <br />Jason Schwarz, P.E. <br />Project Manager <br />JS <br />Attachment: Fee Estimate <br />Agreed to this day of <br />By: <br />Title: <br />Firm: <br />Date to Start Work: <br />Page 3 of 3 <br />20 <br />