Laserfiche WebLink
Geotec hnical Investigation <br />Wallace Neighborhood <br />laotz <br />HVJ Proposal No. AG 1413700 <br />TABLE I <br />GEOTECHNICAL INVESTIGATION BREAKDOWN <br />Field Investigation - Drilling and Soil Sampling <br />Mobilization /Demobilization <br />Drilling & Sampling - Soils 0' -25' <br />Drilling & Sampling - Rock 0' -25' <br />Standard Penetration Tests (SPT) <br />Logging - EIT <br />Support Truck <br />Vehicle Trips <br />Traffic Control <br />Laboratory Testing - Standard <br />Natural Moisture Content (ASTM D -2216) <br />Atterberg Limits (Liquid and Plastic Limits, ASTM D -4318) <br />No 200 Sieve (ASTM D -1140) <br />Unconfined Compression Tests -Rock (ASTM D -2938) <br />Unconfined Compression Tests -Soil (ASTM D -2166) <br />Geotechnical Engineering & Reporting <br />Senior Engineer, P.E. <br />Project Engineer, P.E. <br />Staff Engineer 11, E1T <br />Clerical /Adrninistrative <br />1 <br />@ <br />$310.00 per mobilization <br />$310.00 <br />20 <br />ft @ <br />$14.00 per foot <br />$280.00 <br />30 <br />ft @ <br />$22.00 per foot <br />$660.00 <br />10 <br />@ <br />$22.50 each <br />$225.00 <br />9 <br />hr @ <br />$85.75 per hour <br />$771.75 <br />1 <br />@ <br />$85.00 each <br />$85.00 <br />2 <br />trips <br />$28.50 per trip <br />$57.00 <br />1 <br />@ <br />$800.00 per days <br />$800.00 <br />Sub Total <br />$3,188.75 <br />4 <br />@ <br />$18.00 each <br />$72.00 <br />4 <br />@ <br />$65.00 each <br />$260.00 <br />4 <br />@ <br />$42.00 each <br />$168.00 <br />4 <br />@ <br />$52.00 each <br />$208.00 <br />4 <br />@ <br />$50.00 each <br />$200.00 <br />Sub Total <br />$908.00 <br />2 <br />hr @ <br />$157.45 hr <br />$314.90 <br />10 <br />hr @ <br />$118.25 hr <br />$1,182.50 <br />10 <br />hr @ <br />$85.75 hr <br />$857.50 <br />2 <br />hr @ <br />$59.32 hr <br />$118.64 <br />Sub -Total <br />$2,473.54 <br />Total $6,570.29 <br />