My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-113/approving a professional engineering services agreement between the City and Recreation Engineering & Planning, Inc., for the provision of professional services in connection with the Cross-Town Pathway Trails Project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-113/approving a professional engineering services agreement between the City and Recreation Engineering & Planning, Inc., for the provision of professional services in connection with the Cross-Town Pathway Trails Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 3:35:19 PM
Creation date
9/10/2015 4:50:21 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-113
Date
9/1/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.3 TASK 3 - CONSTRUCTION PLANS AND SPECIFICATIONS <br />The Engineer will: <br />1.3.1 Prepare final design plans and specifications for the Project including technical <br />specifications, typical details and general notes in accordance with the following standards for the <br />City's final review and approval as they are applicable: <br />a) National Environmental Policy Act; <br />b) Architectural Barriers, Texas Department of Licensing and Regulation; <br />C) Americans with Disabilities Act (ADA) Regulations; <br />d) Texas Department of Transportation Design Manual and American Association of <br />State Highway and Transportation Official ( AASHTO) Policy on Geometric <br />Design of Highways and Streets (as amended); <br />e) AASHTO Guide for the Development of Bicycle Facilities, 4th Edition (2012) <br />f) Texas Department of Transportation Standard Specifications ( 2004); <br />h) Texas Manual on Uniform Traffic Control Devices and Texas Department of <br />Transportation Standards (as amended) for the design of traffic control plans; <br />j) Environmental requirements per applicable jurisdiction: TCEQ, TxDOT, City of <br />San Marcos, Texas; <br />k) Historical Commission; <br />1) Hays County; <br />m) Environmental Protection Agency ( "EPA "); <br />n) United States Fish and Wildlife Service; and <br />o) United States Army Corps of Engineers ( "USACE "). <br />p) An awareness of onsite utilities and railroad permitted stipulations. The Engineer <br />will include in construction specifications the requirement that mandatory 811 <br />utility location services be utilized by all construction contractors. <br />q) All QA/QC City adopted Best Practices. <br />1.3.2 Coordinate review of design plans and specifications to ensure compliance with TxDOT <br />requirements and regulations. <br />1.3.3 Submit plans at 60 %, 90 %, and 100% completion for review by the City. The 60% <br />submittal will include plans, a list of specifications, and opinion of construction cost. The 90% <br />and 100% submittals will include plans, specification, bid items, and opinion of construction cost. <br />1.3.4 Incorporate review comments from City stakeholders into the final plans. <br />1.3.5 Conduct, with the City, a QA/QC review at the 60% and 90% milestones. The Engineer <br />will incorporate the review comments into the design. <br />REP Agreement for Cross -Town Pathway Project 9/1/2015 <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.