My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-160/approving a professional engineering services agreement between the City and Unintech Consulting Engineers, inc. for the provision of professional services in connection with the Mill Street Improvements project in the not-to-exceed amount o
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-160/approving a professional engineering services agreement between the City and Unintech Consulting Engineers, inc. for the provision of professional services in connection with the Mill Street Improvements project in the not-to-exceed amount o
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2016 2:12:22 PM
Creation date
12/1/2015 3:08:00 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-160
Date
11/17/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(e) One culvert plan and profile sheet will be prepared for the project for the structure at the north east end of <br />the project. Includes hydrologic and hydraulic calculations <br />(f) Prepare drainage design standards <br />(g) Calculate drainage quantities /estimate <br />Erosion Control Sheets <br />(a) Layouts shall be prepared detailing the locations and quantities of temporary storm water management <br />devices. Temporary storm water management devices shall be needed to minimize the sediment runoff <br />during construction of this project. The anticipated design components to be utilized on this project are silt <br />fence, sand bags, rock filter dams, sediment traps, and construction exits. Permanent erosion control <br />measures shall be included on these sheets as well. <br />(b) Storm Water Pollution Prevention Plan (SW3P) shall be prepared for this job in accordance with TCEQ <br />regulations. These sheets shall consist of the TxDOT SW3P text sheets that summarize erosion control <br />measures. <br />(c) Prepare erosion control standards <br />(d) Calculate erosion control quantities /estimate <br />B. WATER POLLUTION ABATEMENT PLAN <br />The project is NOT located within the Edwards Aquifer Contributing or Recharge Zone. No W PAP is anticipated. <br />VII.SIGNING, PAVEMENT MARKINGS and ILLUMINATION(Permanent) <br />A. SIGNING AND PAVEMENT MARKINGS <br />1. Small signs shall be shown on these plan sheets. Each sign shall have a corresponding number that shall relate <br />that sign to the sign summaries. Pavement markings shall be depicted on these sheets. Scale 1 " =40'. <br />2. Detail sheets for small signs shall be prepared for non - standard signs. This sheet is intended to show the overall <br />dimensions of the signs by determining letter size and spacing. Details shall not be to scale. <br />3. Prepare small sign summary of all signs required within the project limits. <br />4. Prepare pavement markings and sign standards. <br />5. Calculate sign and pavement marking quantities/estimate. <br />B. ILLUMINATION <br />1. Perform illumination calculations for illumination spacing requirements. Coordinate illumination pole <br />type/height with City. <br />2. Illumination sheets will be prepared at 1 " =40', utilizing standard illumination details provided by the City. <br />3. Prepare illumination detail sheets. <br />4. Prepare illumination standards <br />5. Calculate illumination quantities and estimate. <br />VIII. SIGNALS (subconsultant Klotz) <br />A. Task 1: Traffic Signal Warrant Analysis (TSWA) <br />The TSWA for the subject intersection will be conducted based on the guidelines established in the most recent <br />Texas Manual on Uniform Traffic Control Devices (TMUTCD), and will include the following subtasks: <br />1. Data Collection — The traffic data required for the signal warrant analysis includes: <br />• Daily traffic volume (24 -hour traffic volumes for a continuous 24 -hour period) along each approach <br />of the study intersection during a typical weekday (Tuesday, Wednesday or Thursday). <br />i. Peak Hour (7 to 9 AM and 4 to 6 PM) turning movement counts during a typical weekday <br />(Tuesday, Wednesday or Thursday) at the subject intersection. <br />ii. Crash records for the study intersection during the most recent thirty six (36) month period <br />(if available). <br />2. Site Inspection <br />• A site inspection at the study intersection will be conducted to record existing traffic characteristics <br />observed in the field. The field work may include taking measurements, document existing <br />conditions including roadway geometry, signing, striping, speed limits and taking digital photographs <br />Unintech Consulting Engineers, Inc. <br />11/4/2015 <br />5of8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.