My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06162009 Regular Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
2000 s
>
2009
>
06162009 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2009 10:52:02 AM
Creation date
7/9/2009 1:57:12 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Regular Meeting
Date
6/16/2009
Volume Book
182
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SECTION C <br />PIZICING METHODOLOGY <br />Contractor will perform all the services herein for a fixed fee of $XXXX in accordance with the <br />following cost structure: <br /> INITIAL EXPENSES TOTAL FIXED <br />EE&C - KEY TASKS COST (Note 1) COST <br />Estimate the 10-year achievable potential for <br />energy efficiency savings in LCRA's service <br />area <br />Estimate the budget required to realize this 10- <br />year achievable potential <br />Produce technical, program and engineering data <br />for EE&C programs <br />Estimate end-use customer participation <br />rates/levels by program <br />Estimate the expected energy efficiency savings <br />or shifts for each program. <br />Provide information on the type of retail rate <br />structures typically used <br /> <br />Define and analyze significant barriers that <br />wholesale electric customers face <br />Provide an analysis of infrastructure and <br />communication barriers currently impeding the <br />adoption of energy efficiency and conservation <br />measures <br />Provide a comparative analysis of the role of <br />small-scale, distributed and renewable energy <br />options <br />Provide recommendations on best practices and <br />processes that LCRA can adopt <br />Note 1: Expenses are charged on an actual flow through basis with no administration markup. Expenses <br />include air travel, ground travel, car rental, hotel and food costs. <br />Payment for the Services is contingent upon LCRA's receipt and Acceptance of the Deliverable(s) listed <br />above by the LCRA Project Manager. <br />Contractor's fee will be in effect until all services are rendered. <br />General Services RFP LR Revised 09/15/08 <br />Contract #TBD <br />Page 7
The URL can be used to link to this page
Your browser does not support the video tag.