Laserfiche WebLink
I . I K-70111-73111-mms gin UPI= UITMM—Woommim <br />.11c pating, 5,1. ects aisVTsseT%W1""""_ <br />reached, if any, Copies of these records shall be submitted to the Project Sponsor for <br />review and confirmation. <br />Coordination will be maintained with all Federal, State, and local agencies to ensure that <br />their input has been considered during the development of all proposed plans of <br />improvement and to keep them informed on the progress of the study. Coordination with <br />other agencies may require on-site visits and/or correspondence with Federal, State, and <br />local government agencies, institutions, businesses or groups with expertise, <br />responsibilities, or resources related to Flood Risk Management, environmental <br />I Cwlrl-L ucs–�qrl Ti= 177702. <br />PWT-Fo�� i -T 8Td EvalluatioTi: <br />The PL shall ensure that the feasibility study accomplishes the established goals at the <br />anticipated rate, and that all items in the PMP are followed. The PL will lead the PDT <br />toward complete plan formulation. Plan formulation is the process whereby project <br />measures (specific project features) are conceived, developed, and evaluated to satisfy <br />specific objectives, and then combinations of measures are evaluated to develop <br />comprehensive alternative plans. Once the TSP has been identified, and approved at the <br />ADM, additional design of the TSP will be done to reduce risk and uncertainty with cost <br />data, engineering effectiveness, environmental impacts and economic benefits. <br />The alternative plans shall be formulated in a systematic manner to ensure that all <br />reasonable alternatives have been addressed and that the optimum plan has been <br />identified. Each alternative plan shall include environmentally compatible design <br />measures to mitigate any adverse effects on fish and wildlife resources. The alternative <br />plan, which reasonably maximizes NED benefits, shall be identified as the NED plan. <br />Report Preparation: <br />Report preparation will include preparation of internal draft reports, advance draft report, <br />draft report, and final report. The report submittal package will consist of the final <br />Feasibility Report with EIS and Appendices, Supporting Documentation, draft Division <br />and slides. <br />XK <br />RAUMIOMM <br />by other study elements. The Feasibility Report shall consist of the main report and an <br />integrated EIS, and Appendices, and will be prepared in compliance with the <br />requirements of ER 1105-2- 100. The report shall be a complete decision making <br />document and as such shall include a complete presentation of plan formulation. The <br />nde <br />report will be drafted with SMART Planning concepts in accordance with 3 -inch bil <br />H <br />