Laserfiche WebLink
The drawings identified above are not construction drawings and are prepared for use <br />by the Consultant and its subconsultants. The Consultant will certify the final product <br />meets ASTM F1487-11 and ASTM F1951 standards, United States Consumer Product <br />Safety Commission Publication #325 and current ADA requirements. <br />4. Marc Leathers will serve as the Consultant's Project Manager for this Project. The <br />Consultant will not substitute another representative for this Project unless approved <br />in writing by the City in advance of such proposed substitution. In the event the City <br />and the Consultant cannot agree to the substitution of the Project Manager, the City <br />may terminate this agreement in accordance with Article 12 of the Standard Terms <br />and Conditions, Attachment B. _Prior to the start of construction, the Consultant's <br />Project Manager will be available from 9:00 a.m. to 6:00 p.m. Eastern Standard Time <br />and can be reached by telephone or email. The Consultant will also provide the City <br />with access to an on-line project management website to track progress, assign tasks <br />and share documents. The Consultant's Project Manager or his designee will serve as <br />the City's and the construction contractor's main contact with the Consultant for the <br />duration of the construction of the Project This includes one on-site visit prior to <br />construction to meet with the construction contractor to review the design and <br />coordinate with the City and the contractor regarding the start of construction. <br />Sub -contract with Mr. Daniel Brewer, licensed Texas Architect, in order to provide <br />stamped drawings. However, this arrangement will not diminish the Consultant's <br />responsibility to the City for all work product under this Agreement. <br />B. Task 2 - Construction Bidding and Administration <br />Perform Construction Bidding and Administration as detailed in Sections three (3) <br />and four (4) of the City's standard Terms and Conditions, attached as Attachment B. <br />The construction phase of this Project will commence with the award of the <br />construction contract and the terms of this Agreement will remain in full force and <br />effect and the Consultant is responsible for all work included in this Agreement until <br />the associated construction Project has been completed by the Contractor and <br />accepted by the City except for the work referenced in Section 4(s) of Attachment B. <br />The Consultant's responsibility for work referenced in Section 4(s) will survive the <br />expiration of this Agreement until such time that the specified warranty period for <br />this Project is complete in accordance with the construction contract. The projected <br />construction period for this Project is approximately 90 calendar days. It is <br />anticipated that the Consultant will make two site visits during the construction phase <br />of this Project. Additional site visits will be performed as additional services. <br />II. CITY RESPONSIBILITIES <br />The City will: <br />CITY HALL • 630 EAST HOPKINS • SAN MARCOS, TEXAS 78666 512.393.8150 • FACSIMILE 855.759.2846 <br />SANMARCOSTX.GOV <br />4 <br />