My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2017-069/approving an agreement with TMT Solutions, Inc. in connection with the Surface Water Treatment Plant and the Wastewater Treatment Plant Supervisory Control and Data Acquisition Systems for the Public Services Department in the total amount of
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2017
>
Res 2017-069/approving an agreement with TMT Solutions, Inc. in connection with the Surface Water Treatment Plant and the Wastewater Treatment Plant Supervisory Control and Data Acquisition Systems for the Public Services Department in the total amount of
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2017 2:38:18 PM
Creation date
5/3/2017 3:59:36 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2017-69
Date
4/18/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Schedule <br />1.1.17 The following High -Level Timeline/Schedule includes: <br />Installation of Software — Total 5 days <br />a. Installation & Configuration at SWTP — 2 days <br />b. Installation & Configuration at WWTP — 2 days <br />2. Design and Build Screens — Total 40 days <br />a. <br />SWTP Tag Development - 3 days <br />b. <br />WWTP Tag Development — 9 days <br />c. <br />SWTP Tag Screen Development — 15 days <br />d. <br />WWTP Tag Screen Development — 28 days <br />e. <br />SWTP Reporting Design & Testing — 5 days <br />f. <br />WWTP Reporting Design & Testing — 5 days <br />g. <br />DFS HyperTACII (API) Integration — 10 days <br />3. Design Alarms & Thresholds — Total 7 days <br />a. SWTP Alarms & Thresholds — 2 days <br />b. WWTP Alarms & Thresholds — 5 days <br />4. Convert Lookout Historical Data — Total 10 days <br />a. SWTP Data Export — 2 days <br />b. WWTP Data Export — 2 days <br />c. Develop- script to insert data into new database — 5 days <br />Training — Total 25 days <br />a. System Documentation — SWTP — 5 days <br />b. System Documentation — WWTP — 5 days <br />c. SWTP End User Training - 4 days <br />d. WWTP End User Training — 4 days <br />e. SWTP Administrative Training — 2 days <br />f. WWTP Administrative Training — 2 days <br />g. IT Department Training —1 day <br />Database Connectivity <br />The Contractor will : <br />1.1.18 Enable Ignition to connect to a redundant physical server onsite at both locations <br />using credentials provided by the City. During operation, if connectivity or a problem with <br />the primary server renders it inoperative, then the secondary server with the database will <br />fail over and start working immediately. If both servers are down, because of a catastrophic <br />event, the Consultant will bring up a virtual server from a remote location and reroute the <br />City's access to the server, until the primary is operational and running. The City is <br />responsible for the permission and access to the database, and will provide the Contractor <br />with the appropriate rights to install, configure, and troubleshoot, remotely. The Contractor <br />