Laserfiche WebLink
Services described in Section 1.1 above. The Contractor will submit a written estimate of fees <br />to the City and obtain the City's authorization before initiating any additional services. <br />1.2.2 Each material change (deletion or addition) in the services to be provided by the <br />Contractor must be authorized by the City on the Authorization of Change in Services form <br />attached to this Agreement as Exhibit E. Compensation for additional services will be in <br />addition to that specified for Basic Services in accordance with Article 14 of this Agreement. <br />The approval of the San Marcos City Council is necessary for all additional services the <br />compensation for which exceeds $50,000.00. <br />1.2.3 The Contractor will complete its Services in accordance with the schedule included in <br />Subsection 1.1.17. No charge will be made by the Contractor for any hindrance or delay from <br />any cause if the hindrance or delay is caused solely by the Contractor during the progress of <br />any portion of its work contemplated by this Agreement. The City may grant an extension of <br />time at its discretion in the event of such delay in services is caused by the Contractor or the <br />Contractor may charge for the completion of the work, provided it has satisfied that such delays <br />or hindrances were due to causes beyond the reasonable control of the Contractor or the acts of <br />omission or commission by the City. Any such extension of time will be provided utilizing the <br />City's Authorization of Change in Services form included as Exhibit E. <br />1.2.4 The City and the Contractor understand that Inductive Automation provided a software <br />certificate to the Contractor on 12/8/2016. The Contractor has been a Premier Integrator since <br />January 2016. The Contractor is committed to working in concert with Inductive Automation <br />along with the City's IT Department to provide a City with a turn -key SCADA software <br />solution. This includes assisting with the network design and server configuration at both the <br />SWTP and WWTP. <br />1.2.5 Both the City and the Contractor assume and agree that both systems (SWTP and the <br />WWTP): <br />a) Offer unlimited licensing; <br />b) Offer unlimited tags, users, reports and 1/0 devices per gateway/server; <br />C) Are IT friendly; <br />d) Work on any operating system that can run Java JRE; <br />e) Include single file backup and restore that can be automated; <br />f) Include single file install per gateway; <br />g) Have alarming capabilities via email and SMS; <br />h) Are fully redundant systems with automatic fail over and each plant will have <br />primary gateway with a redundant gateway; <br />i) Include built in reporting systems to create custom reports; <br />j) Distribute reports automatically on a schedule; <br />k) Can save to a location or distribute via email; <br />1) Can use Java and Python coding to further improve their system; <br />m) Provide unlimited user licenses per server package; <br />n) Are easy to use, powerful and the design interface allows for a short Project <br />turnaround time; and <br />n) Connects with all major database providers. <br />In addition, both the City and the Contractor understand and agree that the City will contract <br />