My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2017-040/Whisper Zoning Change
San-Marcos
>
City Clerk
>
02 Ordinances
>
2010's
>
2017
>
Ord 2017-040/Whisper Zoning Change
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2017 11:13:57 AM
Creation date
8/29/2017 10:47:42 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Amending
Number
2017-40
Date
8/15/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DIVISION 8' UTILITIES <br />adjoining and draining toward this road. ForTracts <br />1 and 2 ditches to convey additional stormwater <br />A. The City may require the dedication of easements <br />may run through the tracts, but not adjacent to a <br />to accommodate utilities and future maintenance of <br />roadway are allowed. <br />such facilities. <br />2. <br />Along PID Roads B, roadside ditches will be <br />B. Perpetual maintenance of any landscaped or drainage <br />permitted. The ditches will be designed to <br />area in a form approved by the City is required to be <br />accommodate stormwater runoff from PID Road B <br />memorialized on the subdivision plat. <br />and the undeveloped conditions of the acreage of <br />Tracts 3 and 7 adjoining and draining toward this <br />C. Water and Wastewater Infrastructure. The PID <br />road. <br />agreement specifies the location and design of PID <br />funded water and wastewater infrastructure. It is <br />3. <br />Along PID Road A, from IH -35 to the eastern <br />understood that additional infrastructure will be <br />boundary of Tract 4 (the ridge line), roadside <br />required within the project as it develops over time. <br />ditches will not be allowed and drainage will be <br />PID funded water and wastewater infrastructure must <br />conveyed by a system of storm sewer and inlets. <br />comply with the provision of that document. All other <br />The drainage system will be sized to accommodate <br />water and wastewater infrastructure shall be subject <br />water runoff from PID Road A and the undeveloped <br />to the review and approval of the Engineering Director. <br />conditions of Tracts 3 and 4 adjoining and draining <br />D. Electric Service. It is understood and acknowledged <br />toward this road. <br />that the Project will be served by Pedernales Electric <br />4. <br />Along PID Road A, east of the eastern boundary <br />Cooperative electric service provider. The PID <br />of Tract 4 (the ridge line) to PID Road B, roadside <br />document was silent on the installation of electric <br />ditches will be permitted. The ditches will be <br />serviceand as such, the following shall applyregardless <br />designed to accommodate stormwater runoff <br />of the service provider or location. <br />from the undeveloped conditions of Tract 3 <br />adjoining and draining toward this road. <br />1. All mainlines shall be located underground <br />along PID Road C. All mainlines shall be located <br />5. <br />Along PID Road A, from PID Road B to Harris Hill <br />underground along PID Road A from IH 35 to the <br />Road, drainage will be conveyed by a system of <br />LCRA easement. <br />storm sewer and inlets. The drainage system will <br />be sized to accommodate water runoff from PID <br />2. Individual service to properties shall be located <br />Road A and the developed conditions of Tract 6. <br />underground for the entire development. <br />A roadside ditch, if necessary will be permitted on <br />3. It is the responsibility of the developer to fund <br />the north side of PID Road A, adjacent to Tract 7. <br />construction of necessary improvements, ensure <br />The ditch will be designed to accommodate water <br />and provide proof of adequate electric service, <br />runoff from the undeveloped conditions of Tract 7 <br />extend all necessary infrastructure to connect to <br />adjoining and draining to this road. <br />existing facilities, and comply with requirements <br />6. <br />Within four hundred (400) feet of IH -35 or any PID <br />of all service providers. <br />Road, detention facilities or portions of detention <br />E. Stormwater Collection and Drainage Conveyance <br />facilities shall be designed using elements from <br />Systems. The PID document was silent on the issue <br />the Stormwater Technical Manual, Appendix N <br />of stormwater collection and drainage conveyance <br />- Aesthetically Enhanced Detention and Water <br />and as such, the following shall apply regardless of <br />Quality Basins. <br />location of the facilities. <br />7. <br />The developer understands that there will be a <br />1. Along PID Road C, roadside ditches will not be <br />requirement and need for additional detention for <br />permitted and drainage will be conveyed by a <br />Tracts 1, 2, 3, 4, and 7. <br />system of storm sewer and inlets. The drainage <br />8• <br />It will be the Developer or its Successor in Title's <br />system will be sized to accommodate water <br />responsibility to maintain all roadside ditches <br />runoff from PID Road C and for the undeveloped <br />and the Developer warrants to the City that the <br />conditions of the acreage of Tracts 1 and 2 <br />maintenance responsibility will be memorialized <br />WHISPER TEXAS PLANNED DEVELOPMENT DISTRICT Pg. 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.