Laserfiche WebLink
iv. Traffic Signals: Not Included <br /> v. Sidewalks: Existing sidewalks will remain, as possible, and FNI will determine <br /> completion of sidewalk along the remaining corridor as determined by the complete <br /> street analysis. <br /> vi. Intersection with River Road Alternatives: FNI will evaluate 2 intersection alternatives <br /> for the intersection of Uhland Road and River Road to improve safety and the <br /> operational efficiency of the intersection. <br /> F. San Marcos Electric (SMEU) <br /> i. Underground Conduit: Not Included <br /> ii. Photometric for Street Lighting: Not Included <br /> iii. Coordination: FNI will evaluate impacts on the SMEU and will coordinate design <br /> improvements with SMEU. <br /> G. Drainage <br /> i. Watershed Analysis: Not included in this contract. FNI will obtain the latest available <br /> HEC-RAS model of the Blanco River from the City and use this model to evaluate <br /> tailwater conditions as described below. <br /> ii. Determine Alignments: FNI will evaluate installing a storm drainage system that <br /> outfalls to the Blanco River and will evaluate up to two alternatives (one potential new <br /> alignment)that will improve local drainage and avoid adverse downstream impacts per <br /> criteria outlined in the City of San Marcos drainage criteria. This will include <br /> preparation of up to two alternative preliminary plan-view alignments and supporting <br /> rational method calculations, to be summarized in a preliminary engineering report. <br /> iii. Preliminary Hydraulics/Modeling: FNI will determine if the University Heights system <br /> can handle the existing and additional flows from the roadway improvements while <br /> meeting City drainage criteria. Because portions of the project are in the Blanco River <br /> floodplain, and because the Blanco River basin is much larger than the local system's <br /> drainage area, FNI will analyze the local system based on the expected coinciding <br /> tailwater. FNI will estimate the coincident tailwater using the latest available HEC- <br /> RAS model of the Blanco River, and compare with coincidental occurrence guidance <br /> from the TxDOT Hydraulic Design Manual. <br /> iv. Water Quality: FNI will evaluate opportunities to incorporate pretreatment <br /> manufactured devices prior to discharge to the Blanco River. <br /> H. Determine Easement/Land Acquisition Requirements <br /> i. Prepare Exhibits: Easement and right-of-way documents will include exhibit and metes <br /> and bounds description for up to 10 parcels (assuming each less than 0.25 acre/parcel). <br />