My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2017-131/approving an agreement with Freese and Nichols, Inc. for the provision of a professional engineering services in connection with the Community Development Block Grant - Disaster Recovery (CDBG-DR) Uhland Road Improvements design amount estim
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2017
>
Res 2017-131/approving an agreement with Freese and Nichols, Inc. for the provision of a professional engineering services in connection with the Community Development Block Grant - Disaster Recovery (CDBG-DR) Uhland Road Improvements design amount estim
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2017 11:36:34 AM
Creation date
9/12/2017 1:15:15 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2017-131
Date
9/5/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task does not include ROW acquisitions, title search and reporting, and boundary <br /> conflict resolution. <br /> ii. Field Notes <br /> iii. Negotiations of Easements: Not Included <br /> I. Determine Project Permitting/Design Requirements <br /> Based on the alternatives developed and potential environmental constraints identified via <br /> site visits and desktop survey, determine potential permitting and design requirements that <br /> may be imposed by regulatory agencies other than the City such as TxDOT, County, <br /> TCEQ,USACE. <br /> Prepare a section of the preliminary engineering report summarizing the permitting and <br /> design requirements for the alternatives. <br /> J. Identify Utility Providers <br /> Surveyor shall submit tickets to utility providers through Texas 811, One Call, or other <br /> service in order to identify franchise utility providers in the project area. <br /> K. Identify Utility Conflicts <br /> FNI will identify known or potential utility conflicts based on the preliminary design <br /> alternative(s). <br /> L. Develop Construction Cost Estimates <br /> FNI will develop opinion of probable construction costs for the proposed improvements <br /> and, with assistance of the City, will prepare opinions of total probable project costs. <br /> M. Deliverables <br /> i. Monthly Status Report: A brief one page monthly status report summary will be <br /> developed and submitted to the City Project Manager. The status report shall <br /> summarize work completed; percent complete to date for the schedule and budget; <br /> work scheduled to be completed for the upcoming month; and any outstanding issues <br /> or decisions that must be resolved by City staff or the project team. Updates to the <br /> project schedule will be provided, as needed and determined by project status. <br /> ii. Preliminary Engineering Report Draft: FNI will prepare a report summarizing the <br /> efforts outlined above that will include final design recommendations, preliminary <br /> project cost,land needs,typical section alternatives.FNI will solicit the City's feedback <br /> on the report and will incorporate review comments as necessary. <br /> Submittal includes: <br /> • 3 (three)hardcopies <br /> • 1 (one) electronic copy(PDF) <br />
The URL can be used to link to this page
Your browser does not support the video tag.