Laserfiche WebLink
DoouSign Envelope [D 1198537C-14E9-4050-AAD1W89OlA5D50015 <br />ATTACHMENT A <br />CITY OF SAN MARCO <br />Linda Drive fmprovements and Highway 80/Davis Lane Wastewater. Rehab <br />SCOPE OF SERVICES <br />12. Deliverables: <br />a. monthly Status Report: LNV will provide a monthly status report, including a brief <br />summary of work completed. <br />b. Preliminary Engineering Report (PER) (30%): LNV will provide three (3) hard copies of <br />Preliminary Engineering Report (PER) and one (1) pdf electronic copy. At a minimum, the <br />PER will contain the following: <br />i. Field Investigation Data <br />ii. Existing Mater and Sewer Alignments <br />iii. Preliminary Hydraulics/Modeling of the Existing Sanitary Sewer, <br />iv, Proposed sidewalk layout, Linda Dr from River road to Sherbarb Dr. <br />V. Determine Existing Storrs Water Alignments. <br />Vi. Preliminary Hydraulic Modeling of Existing Storrs dater System, <br />vii. Prepare Storm dater Management Report (SWMR) <br />viii. Prepare easement strip map/exhibit. <br />ix, Determine Permitting requirements. <br />X. Provide Utility Conflict Matrix <br />A. Engineer's Opinion of Probable Construction Costs (OPCC). <br />xii. Draft and Final Preliminary Engineering Report <br />c. PER Comment Response Letter <br />Design Phase (60190.1991100% <br />1. Project management and QA/QC: This task consists of effort associated with project <br />administration, coordination with City staff, coordination and supervision of the project team, and <br />quality management so that project milestones and deliverables meet schedule and budget <br />constraints. <br />2. Meetings <br />a. Project Coordination Meetings: Two (2) utility coordination meeting have been budgeted <br />for the Design Phase. It is assumed that meetings will be held prior to beginning 00% <br />and 90% design. LNV will attend meetings with City of San Marcos Staff to determine <br />project constraints and needs as well as discuss design considerations. <br />b, Project meetings: Three (3) project meetings have been budgeted for the Design Phase, <br />following each Milestone submittal (601901100%). <br />0 <br />