Laserfiche WebLink
1.1.7 Head the Project team and coordinate the integration of design issues, surveying, right of <br />way issues, traffic control issues, utility Engineering issues, ADA compliance, permitting, and <br />other services as previously approved and as applicable to the preliminary engineering phase. <br />1.1.8 Prepare preliminary engineering documents for distribution projects (including substation <br />construction and ancillary equipment), involving construction and ongoing System maintenance <br />based on approved design development information and any further adjustments authorized by <br />the City in the scope, quality or budget of the Project. The Engineer will submit two hard copy <br />engineering design plans as well as an electronic copy in PDF and CAD format to the City for <br />review or implementation. <br />1.1.9 Assist in System planning for the 10-year Capital Improvements Project ("CIP") <br />program. <br />1.1.10 Provide System load forecasting and analysis. <br />1.1.11 Provide filings and analysis on behalf of the City, as required by the Electric Reliability <br />Council of Texas ("ERCOT") or the Texas Regional Entity ("TRE"). <br />1.1.12 Attend the Association of Wholesale Customers Power Supply and Transmission <br />Planning ("AWC PSTP") monthly meetings on behalf of the City, as assigned. <br />1.1.13 Use its best professional judgment to create preliminary engineering documents that <br />comply with applicable construction and development codes, local regulations and ordinances <br />and other federal and state regulations which are known or which should reasonably be known to <br />the Engineer including, as applicable, those regulations required under the ADA and Article <br />9102, V.A.C.S., Architectural Barriers Act. In the event the ADA requirements are applicable to <br />a particular Project, the Engineer will be responsible for notifying the City of requirements of the <br />Architectural Barriers Act and any other requirements by the Texas Department of Licensing and <br />Regulation. <br />1.1.14 Ensure that no reports, maps, or other documents produced in whole or in part under this <br />Agreement will be the subject of an application for copyright by or on behalf of the Engineer. <br />1.1.15 Prepare and present to the City budgetary cost estimates for City review, prior to the <br />development of preliminary designs for potential System projects involving construction and <br />maintenance. <br />1.2 TASK 2 - PRELIMINARY DESIGN & SURVEY <br />For each Project as assigned by the City, the Engineer will perform all or some of the services <br />identified in this Section 1.2 as specifically authorized by the Work Authorization Form for each <br />of the Project(s) assigned. <br />1.2.1 Conduct monthly meetings with the City and other interested parties to review progress <br />on the Project. Both parties assume that preliminary design will last three months for each <br />M&S Agreement 2009