My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2021-064/approving Substantial Amendment No. 10 to the Community Development Block Grant-Disaster Recovery (CDBG-DR) Action Plan
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2021
>
Res 2021-064/approving Substantial Amendment No. 10 to the Community Development Block Grant-Disaster Recovery (CDBG-DR) Action Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2021 3:25:55 PM
Creation date
4/29/2021 1:51:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2021-64
Date
4/20/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
559
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Damaged railroad trestles and bridging; and <br />• Blocked and damaged culverts. <br />The following chart shows the FEMA PA summary for this Category. In addition to the Project <br />Worksheets in this area, the City has identified a number of other activities that would be required for <br />Hazard Mitigation. The costs associated with these activities are identified in the Hazard Mitigation <br />section further on in this section. <br />4Cal�,eg o II y V,,, .,W a er Co II rd 0 a c II II II lII e off <br />During the floods of 2015, many of the City's critical drainage facilities were damaged or severely over <br />taxed. The proper functioning of a City's drainage system is crucial to protecting the infrastructure of the <br />City and the safety of its citizens from future weather events. As of the completion of this report, the <br />City has identified the following funding amounts needed to address the repairs needed for its water <br />control facilities; a total of 2 major treatment plants and facilities sustained damage as a result of the <br />flood. <br />Memorial Day $44,650.00 33,49 7.5,0 S11,162.50 <br />!,i_ ';,,, al�,e g o II y 0,,,,, B a,.,)� II II d d In g s,, ';,,, o II c; II s,, a n f � <br />The floods of 2015 impacted many of the City's critical and important public and private buildings. A <br />quick and thorough response to repairing these buildings and replacing their contents is critical to the <br />City's recovery. Several projects have been identified and are being submitted to FEMA for the creation <br />of Project Worksheets for both floods, but the October flood caused considerably more damage to City <br />property. Among the activities which the City is seeking funding for are projects such as: <br />• Replacement of ten (10) City -owned vehicles, including multiple damaged fire trucks and <br />emergency management personnel vehicles; and <br />• Repairs to fencing and other mechanical components of major City -owned buildings. <br />Last Updated 3/03/20 Page 28 of 63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.