My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2022-241R/authorizing a Change in Service to the professional services agreement with Kimley Horn and Associates for Engineering Services related to design and construction phase services for the Sessom Creek
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2022
>
Res 2022-241R/authorizing a Change in Service to the professional services agreement with Kimley Horn and Associates for Engineering Services related to design and construction phase services for the Sessom Creek
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2022 4:52:48 PM
Creation date
12/6/2022 4:36:13 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2022-241R
Date
11/1/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT A <br /> CITY OF SAN MARCOS <br /> SESSOM DRIVE WASTEWATER REPLACEMENT PHASE 2 <br /> (CANYON ROAD EXTENSION) <br /> SCOPE OF SERVICES <br /> d. 95%: KIMLEY-HORN will provide two (2) hard copies of 11"x 17" plan sets and one(1) <br /> pdf electronic copy. The plan set will also contain the following: <br /> i. Update the following sheets due to the removal of the culvert and Loquat Street: <br /> 1. Plan and Profile of Canyon Road—including horizontal and vertical <br /> geometry <br /> 2. Add turnaround sheet for Loquat Street <br /> 3. Cross sections on Canyon Road <br /> 4. Drainage and Grading <br /> 5. Typical Sections <br /> 6. Title, Index, Quantity Sheet Layouts <br /> 7. Intersection Layouts <br /> 8. Driveway Details <br /> 9. Traffic Control Plan <br /> 10. Erosion Control Plan <br /> 11. Standards and Specifications <br /> 12. Notes and Construction Time Line <br /> 13. Engineer's OPCC <br /> 14. Construction Project Schedule: KIMLEY-HORN will coordinate with the <br /> City to revise the Construction Schedule for the project consisting of <br /> design, bid and construction phases. The schedule will be updated <br /> during design. <br /> e. 99% Comment Responses. <br /> f. Final 100%: KIMLEY-HORN will provide two (2) hard copies of 11" x 17" plan sets and <br /> one (1) pdf electronic copy. Upon approval by the City, two (2) hard copies of 11"x 17" <br /> plan sets, one (1) pdf copy, and one(1) CAD copy of the sealed plans will be provided. <br /> The 100% documents will incorporate the plans and specifications provided by EPR to <br /> provide a complete set of contract documents for bidding purposes. <br /> g. Coordination with Byrn and Associates for Platting. Refer to the attached scope by Byrn <br /> and Associates. <br /> -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.