My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-190 approving an On-Call Professional Services Agreement with Lockwood, Andrews and Newnam, Inc., (LAN) to provide engineering services for the Purgatory Creek Improvements, Phase 1 Project in an amount not to exceed $3,281,773.35
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-190 approving an On-Call Professional Services Agreement with Lockwood, Andrews and Newnam, Inc., (LAN) to provide engineering services for the Purgatory Creek Improvements, Phase 1 Project in an amount not to exceed $3,281,773.35
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2024 6:23:38 PM
Creation date
9/26/2024 4:28:04 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
Res 2024-190
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID:7208C774-7FB3-420E-A93E-5DE887787BB7 <br /> a. Drainage Master Plan projects(DMP#15, DMP#25,DMP#13) <br /> b. Natural Channel Design <br /> i. Sediment Impact Study <br /> ii. Channel Stabilization <br /> iii. Channel Plans, profiles, and cross sections <br /> c. Landscape and Illumination Design <br /> i. Landscape layout <br /> ii. Planting/restoration plans <br /> iii. Irrigation design <br /> iv. Soils design <br /> v. Illumination design <br /> d. Channel Flood Mitigation <br /> i. Hydraulic Modeling <br /> ii. Scour Analysis <br /> iii. Storm Sewer Outfall design <br /> e. Utility Conflict Resolution and Design <br /> i. Coordination with third party utility providers to resolve conflicts <br /> ii. Wastewater siphon crossings(3) <br /> iii. Water line relocations <br /> f. Roadway and Traffic Design <br /> i. Traffic control plans <br /> ii. Roadway improvements in project limits <br /> iii. Signage and striping plans <br /> g. Trail, Sidewalk, and Pedestrian Connectivity <br /> i. Trail design <br /> ii. Sidewalk design <br /> iii. Pedestrian hybrid beacons <br /> h. Structural Design <br /> i. Vehicular bridge design <br /> ii. Pedestrian bridge design <br /> iii. Retaining wall design <br /> iv. Weir and spillway design <br /> i. Erosion and Sedimentation Controls <br /> i. Limits of construction <br /> ii. BMP strategies <br /> iii. Dewatering plan <br /> iv. Sequencing <br /> 2. UPRR Coordination <br /> a. Prepare and provide design deliverables to UPRR <br /> b. UPRR bridge structural analysis <br /> c. Site visit with UPRR <br /> 3. TxDOT Coordination <br /> a. Meetings <br /> b. Prepare and provide design deliverables to TxDOT <br /> 4. FEMA Coordination <br /> E. Bid Phase Services <br /> 1. Provide bid phase services including: <br /> a. Attend pre-bid meeting <br />
The URL can be used to link to this page
Your browser does not support the video tag.