My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-111 approving an agreement with Garver, LLC, for services to update the San Marcos Regional Airport Master Plan in the estimated amount of $171,463.50
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-111 approving an agreement with Garver, LLC, for services to update the San Marcos Regional Airport Master Plan in the estimated amount of $171,463.50
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 10:13:26 PM
Creation date
10/8/2024 10:06:55 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-1111
Date
7/2/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID:6235D262-566F-44E2-97FE-4F655390BCEC <br /> • Utility and drainage analysis or investigation <br /> • Aerial photography <br /> • Development or modification to GIS systems or tools <br /> • Revisions to, or the development of language to revise, Airport leases, rules and regulations, <br /> minimums standards, or other airport policies <br /> • Detailed facility assessments/reviews <br /> • Property/Title Research <br /> • Pavement or facility condition testing or the establishment of a pavement maintenance program <br /> • Environmental work or analysis <br /> • Geotechnical evaluation <br /> • Site visits to observe pavement conditions outside of those specifically identified in the scope <br /> • Environmental testing or investigation work <br /> • Graphic conceptual renderings of existing or future facilities <br /> • The preparation of materials and exhibits for leases, development contracts, or other <br /> documents/materials <br /> • Detailed engineering cost estimates <br /> • Design or conceptual design work <br /> • Forecasting <br /> • Terminal planning <br /> • Public outreach/engagement other than what is specifically identified in the scope <br /> Appendix A- Scope of Services 7 of 7 <br /> HYI —Airport Master Plan Update Garver Project No. 2302305 <br />
The URL can be used to link to this page
Your browser does not support the video tag.