My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-193 approving an agreement with Halff Associates, Inc., for professional services associated with development of the Quail Creek Preliminary Design Report for the former Quail Creek Country Club property located at 2701 Airport Highway 21
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-193 approving an agreement with Halff Associates, Inc., for professional services associated with development of the Quail Creek Preliminary Design Report for the former Quail Creek Country Club property located at 2701 Airport Highway 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 4:47:57 PM
Creation date
11/3/2024 10:39:36 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-193
Date
10/2/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: BOCECOFB-76E6-4AA8-BDA4-ED2B9C3F4C27 <br /> 13620 Briarwick Dr, Suite 100 <br /> ■�II�II�II�I■11111111illim ha <br /> �,� Austin,Texas 78729 <br /> M E N Phone(512)777-4600 <br /> -4600 <br /> • Provide direction necessary for aesthetic treatment of proposed structures, amenities and <br /> landscaping. <br /> • Provide a CITY team consisting of Public Works, Parks, Planning/ Development Services and <br /> other internal department members to provide consistent and thorough <br /> review/communication throughout design and permitting process. <br /> • Pay/waive all CITY filing, permit review, application and inspection fees. <br /> • Provide any other pertinent information to assist design CONSULTANT. <br /> BASIC SERVICES <br /> Phase 00 Master Planning I Public Engagement <br /> This phase includes preparation of potential alternatives for the future layout and programmatic <br /> configuration of Quail Creek Parkland.These alternatives will be presented to the public and City staff to <br /> gather feedback and preferences. Community preferences and City comments will be compiled to <br /> determine the preferred vision for the park. A final draft master plan will be reviewed by CITY staff.The <br /> final draft plan will be presented at the second public meeting and CITY Council. This phase includes the <br /> following tasks: <br /> 2.01 Site inventory review <br /> a) Evaluate records and research material that was gathered during the site investigation effort <br /> in 2023 to ensure all information is still valid. Any updated information will be reflected in <br /> the final deliverable. <br /> 2.02 Conceptual Master Plans <br /> a) Develop three (3) preliminary concept plans establishing overall character and image of <br /> the park based on the site visit of park and City provided feedback. Preliminary concepts <br /> will be conceptual in nature with labels to show proposed locations of program items, <br /> pedestrian and vehicular circulation. Concepts will be complimented with associated <br /> photos to represent program activities on the plan. Review with CITY staff for <br /> comment. One round of comments is accounted for with this task. <br /> 2.03 Online Community Survey <br /> a) Utilize one (1) online survey(via the City's website)to solicit feedback from the general <br /> public on issues related to the Quail Creek concepts.The survey will contain questions <br /> related to our planning process and shall not exceed 30 questions in length. <br /> b) A call with the CITY at the beginning of the process will determine the content, specific <br /> length and other details related to the online community survey. <br /> c) CONSULTANT will develop a draft survey containing preliminary questions and content <br /> for CITY staff review and approval. <br /> SAN MARCOS QUAIL CREEK PRELIMINARY DESIGN REPORT PAGE 4 <br /> SCOPE OF SERVICES September 4,2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.