My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2008-051
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2008
>
Res 2008-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2008 1:40:13 PM
Creation date
4/22/2008 9:38:06 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2008-51
Date
4/15/2008
Volume Book
175
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Activity Measure Successful <br /> Yes/Na <br />1. Test meters with Eka electric and water Read with Field Tool to <br />nodes at the City's meter shops. verify communication and <br /> acknowledge meter ID on at <br /> least five 5 meters <br />2. Confirm Self-Organization/Self-Activation. Confirmed Node is seen in <br /> EkaNetT"" Network Manager <br /> in "read state" <br />3. Confirm Self Healing -EkaNode selects Block RF path on meter <br />alternate path when a peer is not that is primary hop for <br />operational. another meter and confirm <br /> data comes through via <br /> alternate path within 24 <br /> hours. <br />4. Register Read Data exports successful using HHF for interval and MVRS <br />HHF, CSV or MVRS to the Harris S stem. for billin <br />5. Confirm Data Reliability/Redundancy - View neighbor "peer" table <br />Select a data component and ensure that it is in EkaNetT'" Network <br />available at the EkaNode, Gateway and head- Manager to see alternate <br />end system. path for Nodes <br />6. Can system perform scheduled reads? Daily delivery of register <br /> and interval data as <br /> scheduled in EkaNetT"" <br /> Network Manager confirms <br /> scheduled reading <br /> ca abilit <br />7. Can System perform on-demand electric Confirmed with executing <br />meter reads? "on-demand" electric meter <br /> read from EkaNetT"" Data <br /> Mana er <br />8. Can System deliver load profile information Confirmed in EkaNetT"" Data <br />for electric and water meters? Mana er. <br />9. Achieved an average 95% success rate for Standard report in <br />delivery of daily register reads? EkaNetT"" Network Manager <br /> provides daily report of <br /> missed reads to confirm <br /> ercenta e. <br />10. Is System capable of recovering missed load Confirmed in EkaNetT"" Data <br />rofile data? Mana er <br />11. Time accuracy is synchronized to within 5 Verify time sync through <br />seconds of National Institute Standard Time EkaNetT"' Network Manager <br />NIST across the entire network. to . <br />1.3.10 Beta Testing: Upon receipt of written notification of Alpha acceptance from the City, the <br />Vendor will perform Beta testing in accordance with the following Beta Success Criteria Table: <br />Advanced Metering Infrastructure Agreement Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.