Laserfiche WebLink
Activity Measure Successful <br /> Yes/No <br />1) Test meters with Eka nodes at the City's Read with Field Tool to <br />meter shop. verify communication <br /> and acknowledge meter <br /> ID on at least five (5) <br /> meters. <br />2) Confirm Self-Organization/Self-Activation. Confirmed Node is seen <br /> in EkaNetT"" Network <br /> Manager in "ready <br /> state" <br />3) Confirm Self Healing -EkaNode selects Block RF path on meter <br />alternate path when a peer is not operational. that is primary hop for <br /> another meter and <br /> confirm data comes <br /> through via alternate <br /> ath within 24 hours <br />4) Verify system supports selected meter Meter is read by <br />latforms network mana er <br />5) Data exports for Harris Computers, Inc. HHF for interval and <br />utility billing application. MVRS for billing <br />6) Confirm Data Reliability/Redundancy - View neighbor "peer" <br />Select a data component and ensure that it is table in EkaNetT"" <br />available at the EkaNode, Gateway and head- Network Manager to see <br />ends stem. alternate ath for Nodes <br />7) Can System perform scheduled register Daily delivery of <br />reads? register and interval <br /> data as scheduled in <br /> EkaNetT"" Network <br /> Manager confirms <br /> scheduled reading <br /> ca abilit <br />8) Can System perform on-demand electric Confirmed with <br />reads? executing "on-demand" <br /> electric meter read from <br /> EkaNetT"" Data Mana er <br />9) Can System deliver load profile information Confirmed in EkaNetT"" <br />for electric and water meters? Data Mana er. <br />10) Achieved an average 99.5% success rate for Standard report in <br />delivery of daily reads for last week? EkaNetT"" Network <br /> Manager provides daily <br /> report of missed reads <br /> to confirm ercenta e. <br />11) Is System capable of recovering missed load Confirmed in EkaNetT"" <br />profile data? Data Manager <br />12) Time accuracy is synchronized to within 5 Verify time sync <br />seconds of NIST across the entire network. through EkaNetT"" <br /> Network Mana er to . <br />13) Provided training to the City's personnel in City technician install <br />retrofitting Eka Node and/or installation of Eka hardware <br />hardware. <br /> <br />Advanced Metering Infrastructure Agreement Page 10 <br />