My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2025 11:02:36 AM
Creation date
7/14/2025 4:15:49 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-125
Date
7/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: DA4FA5BF-D9AF-4543-AD49-B8F98E2726F6 <br /> o Construction of remaining plant structures and civil/site work <br /> o Commissioning and Start-up <br /> Task 1 — Interim Wastewater Management <br /> The Design-Builder will: <br /> 1. Consider and propose up to two (2) alternatives to accept and ultimately treat initial <br /> wastewater flows that are conveyed to the project site prior to operation of the <br /> Facility. The Owner is currently contractually obligated to provide wastewater service <br /> for flows delivered to the Project site by others by March 1, 2026. <br /> 2. Alternative development will include: <br /> a. Considerations for site improvements such as dual-lane access points for <br /> vacuum trucks and temporary infrastructure necessary to support pumping <br /> and hauling interim wastewater flows to the Owner's existing wastewater <br /> treatment plant. The Owner will consider the rental or purchase of necessary <br /> equipment to pump and haul these interim wastewater flows to the Owner's <br /> existing wastewater treatment plant. <br /> b. Considerations for implementing a package plant or another design solution <br /> as necessary to handle increasing interim wastewater flows prior to operation <br /> of the permanent Facility. <br /> Task 1 Deliverables: <br /> • Alternatives analysis and technical memorandum for interim wastewater <br /> management, including decision points for implementation of package plant <br /> • 60% Pre-Final Design Package for selected interim wastewater management <br /> approach <br /> Task 1 Assumptions: <br /> 1. TCEQ discharge permit will not be required for implementation of pump and haul <br /> solution <br /> 2. TCEQ will provide review of temporary management plan prior to Owner's <br /> implementation of pump and haul operations. <br /> 3. The 60% design for Task 1 will be developed to sufficient detail to support <br /> procurement and development of the GMP No. 1 Proposal. Interim deliverables <br /> will not be provided in the interest of maintaining the project schedule. <br /> 4. Platting for the wastewater treatment plant site has been included in Phase 1 design <br /> services. The extent of the Traffic Impact Analysis is limited to submission of the <br /> 2 Exhibit B — Phase 1 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.