My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2025 11:02:36 AM
Creation date
7/14/2025 4:15:49 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-125
Date
7/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: DA4FA5BF-D9AF-4543-AD49-B8F98E2726F6 <br /> - Field Investigation Plan <br /> - Risk Register <br /> - Environmental Management Plan (Phase 2) <br /> - Site Logistics Plan (Phase 2) <br /> - Construction Emergency Response Plan and Site Safety Plan (Phase 2) <br /> - Startup & Commissioning Plan (Phase 2) <br /> 4. Based on the Owner review and feedback, submit Final Project Management <br /> Plan within two weeks of receiving the Owner comments. <br /> 5. Participate in biweekly progress meetings to review Project status. The Owner <br /> may modify this frequency throughout the Project as necessary. <br /> 6. Submit monthly invoices in compliance with all Owner requirements; report <br /> Phase 1 planned versus actual progress monthly. <br /> Task 2 Deliverables: <br /> • Draft and Final Project Management Plan <br /> • Progress Meeting Minutes <br /> • Monthly Invoices/Progress Reports <br /> Task 2 Assumptions: <br /> • Approximately 9-month Phase 1 duration <br /> • Meeting minutes will be reviewed by Owner and Owner's Advisor within one (1) <br /> week of distribution. After one (1) week, if no comments or changes have been <br /> requested, the minutes are presumed correctly recorded and will be finalized. <br /> Task 3—Alternative Analyses and Technical Workshops <br /> The Design-Builder will perform an analysis of various technical alternatives to allow the <br /> Owner to make decisions necessary to refine the scope of the Project prior to <br /> Engineering Design Development. The biological treatment process will be the primary <br /> focus of the alternatives analysis effort. The major treatment processes that will be <br /> evaluated include: <br /> • Biological treatment process alternatives and overall treatment plant process <br /> alternatives including: <br /> o Preliminary/Primary Treatment <br /> o Biological Treatment (up to 4 alternatives for initial Options Workshop and <br /> 2 alternatives for detailed Alternatives Analysis) <br /> o Filtration <br /> o Disinfection <br /> o Dewatering & Solids Handling <br /> 4 Exhibit B - Phase 1 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.