My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2025 11:02:36 AM
Creation date
7/14/2025 4:15:49 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-125
Date
7/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: DA4FA5BF-D9AF-4543-AD49-B8F98E2726F6 <br /> • Design-Builder Proposed Contingency Justification (based on updated <br /> construction risk register) <br /> • 60% Design-Build Schedule <br /> • 60% Procurement and Buyout Plan <br /> Design Development by Discipline: <br /> Discipline Included Design Elements Approximate % <br /> Progressed <br /> Civil/Site Site plan with grading and pavement, yard 60% <br /> piping and stormwater elements, pipe and <br /> valve schedules, and basic earthwork and <br /> fencing technical requirements. Profile of <br /> gravity sewers. <br /> Structural Plan and section drawings of each structure, 55% <br /> basic concrete structure/mix design, type of <br /> framing for metal structures, foundation type, <br /> size, and depth information. <br /> Architectural Building materials of construction and 55% <br /> construction type, identification of building <br /> code requirements, plan and elevation <br /> drawings for buildings, coating requirements, <br /> and door and window schedule. <br /> Mechanical U-value and heat load calculations, establish 40% <br /> HVAC/Plumbing required ventilation rates for new buildings, <br /> general arrangement drawings of equipment, <br /> fire protection requirements, equipment <br /> schedule and high-level sequence of <br /> operation. <br /> Process General arrangement and section drawings of 70% <br /> process equipment, process flow diagram, <br /> hydraulic profile, major equipment list and <br /> specifications for major process equipment for <br /> the purposes of early procurement . <br /> Electrical (Power) Preliminary one-line diagrams and load 40% <br /> calculations, major power system routing from <br /> Owner provided power supply and major duct <br /> bank siting, backup power requirements, <br /> schedule of major equipment, technical <br /> requirements lightning protection, site lighting, <br /> and security, and specifications for long lead <br /> major electrical equipment for the purpose of <br /> early procurement. <br /> 10 Exhibit B — Phase 1 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.