My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2008-064
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2008
>
Res 2008-064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2008 3:33:18 PM
Creation date
5/13/2008 4:23:20 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2008-64
Date
5/6/2008
Volume Book
176
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.6 TASK 4 -INTERMEDIATE DESIGN <br />The Engineer will: <br />1.6.1 Prepare an intermediate design plan and supporting documents for the Project, including <br />plan and profile, in sufficient detail to indicate clearly the problems involved including <br />approximate locations of the existing utilities within the Project site or right-of--way and <br />anticipate the design, if appropriate, of solutions to minimize conflicts. <br />1.6.2 Show on the plan existing topographical features including improvements within and <br />outside the right-of--way necessary for the design of the Project. Also show any fence or <br />structural encroachments, and identify whether or not removal is necessary for construction <br />and/or utility relocation. <br />1.6.3 When applicable, show adequate existing property-line elevations, proposed top-of--curb <br />elevations, proposed top-of-channel elevations and adequate proposed flow-line elevations on <br />the profiles. <br />1.6.4 Under separate cover, submit one set of hydrological and hydraulic calculations to <br />support the proposed drainage design. Also plot and submit the energy lines and hydraulic grade <br />lines on one set of prints for review by the City. <br />1.6.5 When both drainage and street reconstruction are included in the Project, show the <br />proposed drainage facilities and street improvements on the same plan and profile sheets. <br />1.6.6 Include street and drainage cross sections for every fifty-foot station (plus any <br />intermediate stations if field conditions so dictate) at a scale of 1" = 40'-0" horizontally and 1" _ <br />10'-0" vertically unless otherwise directed by the City. These designs will combine the <br />application of sound engineering principles with a high degree of economy. Design standards of <br />other agencies, when approved by City, will be used when so directed by the City's Project <br />Manager. <br />1.6.7 Unless directed otherwise by the City, provide drawings that include, but are not limited <br />to plan and profile sheets with the plan portion at a scale of 1" = 40' - 0" and the profile portion <br />at a scale of 1" = 40'-0" horizontally and 1" = 10'-0" vertically. All scales should be <br />conveniently located on each sheet and have the scaled number ratios on corresponding <br />horizontal or vertical scales readily noticeable. All drawings will be submitted on standard 11" <br />by 17" sheets (untrimmed). <br />1.6.8 Furnish a cost estimate based on the plan and supporting documents of the proposed <br />construction (excluding land costs). The cost estimate will be based on the latest unit prices for <br />similar work as provided by the Engineer. The City will assist in providing unit prices and <br />approve any adjustments to reflect the ease or difficulty of constructing the Project. <br />~~IB;e.iS'x6; 1c,£'4Slaa~ii <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.