The City of San Marcos is also interested in installing a boardwalk from the large pavilion at <br />• g p <br />Children's Park - Playscape to the Rio Vista Dam. The boardwalk would connect with the <br />existing trail just prior to the railroad crossing and extend 750 feet along the western bank of <br />the San Marcos River to the Rio Vista Dam. The boardwalk would consist of a 750 -foot long <br />by 6 -foot wide walkway with a concrete capped 25 -foot by 40 -foot platform at the Rio Vista <br />Dam. The existing trail consists of granite aggregate, is shaded by bald cypress and has <br />heavy foot traffic, which promotes ground compaction and subsequent slope erosion. <br />Installation of the boardwalk would decrease foot traffic in the area and subsequent soil <br />compaction and erosion. <br />Additional recreational betterments within various parks along the San Marcos River would <br />include: installation of geotextile pathways from the main recreational trail to picnic tables <br />(2500 sq ft); repair of degraded trail steps (50 cu ft); installation of retaining walls (100 cu <br />ft); installation of concrete sidewalks (1400 cu ft); modifications to the existing Rio Vista <br />Dam access point (7500 cu ft); and modifications to the culvert and low water bridge south of <br />Cheatham Street. <br />The development of signage for each of the proposed project measures could also be used as <br />betterments and would provide education and informational material to the p ublic. This <br />would include signage to identify rare and endangered plant and wildlife such as Texas wild <br />rice populations in order to educate the public and decrease damage to the plants. <br />Any recreational amenities that would be included in the initial restoration project would be <br />cost - shared 50% Federal Government and 50% City of San Marcos and should not increase <br />the total Federal costs by more than 10 %. All recreational costs above the 10% Federal share <br />would be the full responsibility of the City of San Marcos. The addition of recreational <br />amenities in the ecosystem restoration project would require USAGE Headquarters (HQ) <br />approval of the Project Cost - sharing Agreement (PCA), which would increase the total <br />project schedule by approximately 60 to 90 days. Any recreation, in which the USAGE <br />participates, must also be consistent with law and policy regarding the USAGE ecosystem <br />restoration mission. <br />The City of San Marcos has proposed the use of monitoring within the project area following <br />construction. The monitoring would focus primarily on sediment quality and adaptive <br />management of installed restoration features to maximize habitat benefits. The sponsor <br />would monitor and assess dredged sediment from the San Marcos River for pollutant levels. <br />This type of monitoring would allow the US FW S, TP WD and City of San Marcos to track <br />the long -term health of the river and identify future project management needs. Specifics <br />regarding dredged soil monitoring will be assessed during the Feasibility phase of the project. <br />OMIT THIS SECTION — R.IGHT? <br />11) The San Marcos River Coalition: The San Marcos River Coalition is a public /private <br />partnership whose goal is to enhance aquatic habitat in a two mile stretch of the San Marcos <br />River by eradicating a recently introduced invasive plant species, Cryptccoryne beckettii. <br />Following eradication efforts, the coalition will reestablish 78 colonies of six native aquatic <br />plant species, which will improve recovery efforts for the endangered, fountain darter and <br />Texas wild rice. <br />10 <br />