My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2010-002
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2010
>
Res 2010-002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2010 10:48:22 AM
Creation date
1/15/2010 2:57:09 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2010-2
Date
1/5/2010
Volume Book
184
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
data and information in the City's possession needed by the Engineer at the Engineer's request. <br />2.2 Designate Rey A. Garcia, P.E. as the City's Project Manager and authorized <br />representative to act on the City's behalf with respect to this Agreement. The City will examine <br />the documents and information submitted by the Engineer and promptly render responses to the <br />Engineer on issues requiring a decision by the City. <br />2.3 Provide access to and make all necessary provisions for the Engineer to enter public and <br />private property as required for the Engineer to perform its services under this Agreement. <br />2.4 Be responsible for assigning City inspectors to the Project site as needed. <br />2.5 Be responsible for the printing and binding of all construction contract manuals. <br />2.6 Coordinate and obtain the meeting site and set time and date for all Project meetings. <br />2.7 Be responsible for the costs associated with the submission of plans for review by other <br />entities /jurisdictions. <br />2.8 Bear all other costs incidental to this Article. <br />ARTICLE 3 <br />CONSTRUCTION COST <br />3.1 DEFINITION <br />3. 1.1 The construction cost will be the total cost or estimated cost to the City of all elements of <br />the Project designed or specified by the Engineer. <br />3.1.2 The construction cost will include at current market rates, including a reasonable <br />allowance for overhead and profit, the cost of any equipment that has been designed, specified, <br />selected or specially provided for by the Engineer, except that used materials and equipment will <br />be included as if purchased new for the Project. <br />3.1.3 Construction cost does not include the compensation of the Engineer and the Engineer's <br />consultants, or other costs which are the responsibility of the City as provided in Article 2. <br />3.2 RESPONSIBILITY FOR CONSTRUCTION COST <br />3.2.1 Evaluations of the City's Project budget and detailed cost estimates, if any, prepared by <br />the Engineer, will represent the Engineer's best judgment as a design professional familiar with <br />the construction industry. <br />3.2.2 A fixed limit of construction cost for this Project will be established by the City's <br />representative after consulting with the Engineer. The Engineer will be permitted to include <br />contingencies for design, bidding and price escalation, to determine what materials, equipment, <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.