Laserfiche WebLink
1.5.2 Insert return envelopes and any City inserts into each utility bill or delinquent notice as <br />requested by the City. <br /> <br />1.5.3 Detect and correct doubles or misses at insert stations, missed or unopened flaps on <br />envelopes, misalignment at final insertion area, or other equipment malfunctions. <br /> <br />1.6 TASK 5 - SORTING/MAILING <br /> <br />The Contractor will: <br /> <br />1.6.1 Sort all mail-outs to achieve the greatest potential discount possible on mailing costs. <br /> <br />1.6.2 Provide all mailing supplies required to mail utility bills and delinquent notices. <br /> <br />1.6.3 Ensure that all utility bills and delinquent notices are generated and mailed within one <br />business day fi:om the day data is transferred to Contractor. <br /> <br />1.6.4 Use the CityofSanMarcos, Utility Billing Department, 636 E. Hopkins, SanMarcos, Texas <br />78666 as the official address and include this address and the City Seal on all City of San Marcos <br />mail-outs until such time that the City notifies Contractor otherwise. <br /> <br />1.6.5 Ensure that all envelope flaps are properly sealed and secured prior to mailing and that the <br />bar code is on all mail-outs for the most economical postage rate. <br /> <br />1.7 TASK 6 - REPORTS <br /> <br />The Contractor will: <br /> <br />1.7.1 Provide detail and summary reports (electronically) of transactions for each mail- <br />out/distribution through access to the Dataprose DP Job Trax menu. The reports will include current <br />project production reports, overall production reports, and history and analysis of billing information. <br /> <br />1.7.2 TranSmit production reports to the Citywithin one business day fi:om the day of data transfer <br />to Contractor. <br /> <br />1.7.3 Maintain the United States Parcel Service ("USPS") Coding Accuracy Support System <br />("CASS") certification processing software or a software which performs the same function for the <br />purpose of ensuring a current address verification process for the City. <br /> <br />1.8 TASK 7 - WAREHOUSING <br /> <br />The Contractor will: <br /> <br />3 <br /> <br /> <br />