Laserfiche WebLink
Docusign Envelope ID: B4237C90-FBOF-82E3-836F-A5CFD2F500AA <br /> C42 North Side 12 In Water Connection aka William Pettus Extension City of San Marcos <br /> Engineering Design Services Exhibit B <br /> Services to be Provided by the Engineer <br /> iii) Phase 1 and Phase 2 Construction Schedules in pdf format. <br /> iv) GIS Submittal Checklist in pdf format. <br /> v) Engineering/CIP Plan Review Checklist in pdf format. <br /> vi) Response to 30%Comments in pdf format. <br /> vii) List of Specifications in pdf format. <br /> 4. 90% Design Phase <br /> a) 90% Design Development <br /> i) BGE will develop 90%design plans for Phase 1 and Phase 2 of the waterline alignment <br /> meeting the City of San Marcos Plan Review Checklist. This includes plan and profile view for <br /> the alignment. <br /> b) Engineers' Opinion of Probable Construction Cost(OPCC) <br /> i) BGE will prepare a 90%OPCC for Phase 1 and Phase 2. <br /> c) Specifications <br /> i) BGE will compile the specifications and bid forms to be used on the project for Phase 1 and <br /> Phase 2. <br /> d) Deliverables—two sets of deliverables for two separate packages <br /> i) 90% Phase 1 and Phase 2 Plan Sets in pdf and dwg format. <br /> ii) 90% Phase 1 and Phase 2 OPCCs in pdf format. <br /> iii) Phase 1 and Phase 2 Construction Schedules in pdf format. <br /> iv) GIS Submittal Checklist in pdf format. <br /> v) Engineering/CIP Plan Review Checklist in pdf format. <br /> vi) Response to 60%Comments in pdf format. <br /> vii) Phase 1 and Phase 2 Specifications in pdf format. <br /> viii) Phase 1 and Phase 2 Bid Form in excel format. <br /> 5. 100% Design Phase <br /> a) 100% Design Development <br /> i) BGE will develop 100%design plans for Phase 1 and Phase 2 of the waterline alignment <br /> meeting the City of San Marcos Plan Review Checklist. This includes plan and profile view for <br /> the alignment. <br /> b) Engineers' Opinion of Probable Construction Cost(OPCC) <br /> i) BGE will prepare a 100%OPCC for Phase 1 and Phase 2. <br /> c) Specifications <br /> i) BGE will compile the specifications and bid forms to be used on the project for Phase 1 and <br /> Phase 2. <br /> d) Deliverables—two sets of deliverables for two separate packages <br /> i) Sealed Phase 1 and Phase 2 Plan Sets in pdf and dwg format. <br /> ii) 100% Phase 1 and Phase 2 OPCCs in pdf format. <br /> iii) Phase 1 and Phase 2 Construction Schedules in pdf format. <br /> iv) GIS Submittal Checklist in pdf format. <br /> v) Engineering/CIP Plan Review Checklist in pdf format. <br /> 4 <br />