My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2026-099 Approving an angreement with BGE, Inc.to provide professional design and engineering services for the North Side 12-inch water connection project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2026
>
Res 2026-099 Approving an angreement with BGE, Inc.to provide professional design and engineering services for the North Side 12-inch water connection project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2026 2:11:12 PM
Creation date
7/14/2026 4:39:01 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2026-099
Date
7/7/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: B4237C90-FBOF-82E3-836F-A5CFD2F500AA <br /> C42 North Side 12 In Water Connection aka William Pettus Extension City of San Marcos <br /> Engineering Design Services Exhibit B <br /> Services to be Provided by the Engineer <br /> iii) Phase 1 and Phase 2 Construction Schedules in pdf format. <br /> iv) GIS Submittal Checklist in pdf format. <br /> v) Engineering/CIP Plan Review Checklist in pdf format. <br /> vi) Response to 30%Comments in pdf format. <br /> vii) List of Specifications in pdf format. <br /> 4. 90% Design Phase <br /> a) 90% Design Development <br /> i) BGE will develop 90%design plans for Phase 1 and Phase 2 of the waterline alignment <br /> meeting the City of San Marcos Plan Review Checklist. This includes plan and profile view for <br /> the alignment. <br /> b) Engineers' Opinion of Probable Construction Cost(OPCC) <br /> i) BGE will prepare a 90%OPCC for Phase 1 and Phase 2. <br /> c) Specifications <br /> i) BGE will compile the specifications and bid forms to be used on the project for Phase 1 and <br /> Phase 2. <br /> d) Deliverables—two sets of deliverables for two separate packages <br /> i) 90% Phase 1 and Phase 2 Plan Sets in pdf and dwg format. <br /> ii) 90% Phase 1 and Phase 2 OPCCs in pdf format. <br /> iii) Phase 1 and Phase 2 Construction Schedules in pdf format. <br /> iv) GIS Submittal Checklist in pdf format. <br /> v) Engineering/CIP Plan Review Checklist in pdf format. <br /> vi) Response to 60%Comments in pdf format. <br /> vii) Phase 1 and Phase 2 Specifications in pdf format. <br /> viii) Phase 1 and Phase 2 Bid Form in excel format. <br /> 5. 100% Design Phase <br /> a) 100% Design Development <br /> i) BGE will develop 100%design plans for Phase 1 and Phase 2 of the waterline alignment <br /> meeting the City of San Marcos Plan Review Checklist. This includes plan and profile view for <br /> the alignment. <br /> b) Engineers' Opinion of Probable Construction Cost(OPCC) <br /> i) BGE will prepare a 100%OPCC for Phase 1 and Phase 2. <br /> c) Specifications <br /> i) BGE will compile the specifications and bid forms to be used on the project for Phase 1 and <br /> Phase 2. <br /> d) Deliverables—two sets of deliverables for two separate packages <br /> i) Sealed Phase 1 and Phase 2 Plan Sets in pdf and dwg format. <br /> ii) 100% Phase 1 and Phase 2 OPCCs in pdf format. <br /> iii) Phase 1 and Phase 2 Construction Schedules in pdf format. <br /> iv) GIS Submittal Checklist in pdf format. <br /> v) Engineering/CIP Plan Review Checklist in pdf format. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.