My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2026-099 Approving an angreement with BGE, Inc.to provide professional design and engineering services for the North Side 12-inch water connection project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2026
>
Res 2026-099 Approving an angreement with BGE, Inc.to provide professional design and engineering services for the North Side 12-inch water connection project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2026 2:11:12 PM
Creation date
7/14/2026 4:39:01 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2026-099
Date
7/7/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: B4237C90-FBOF-82E3-836F-A5CFD2F500AA <br /> C42 North Side 12 In Water Connection aka William Pettus Extension City of San Marcos <br /> Engineering Design Services Exhibit B <br /> Services to be Provided by the Engineer <br /> 2. Surveying Services <br /> BGE shall perform supplemental research and field surveying outside the limits of the County project to <br /> provide a waterline route, easement field notes, and locating up to two (2) bore holes. The following <br /> surveying services shall be conducted for the Project: <br /> a) Establish Site Control —3 primary points. <br /> b) Topographic, Tree, Boundary Verification Survey <br /> i) Topographic and boundary verification survey, along the Phase 1 and Phase 2 waterline <br /> alignment, outside of the County project limits, sufficient to produce 1' contours. Project <br /> controls shall be established with a minimum of three (3) monuments set. All visible utility and <br /> surface features shall be surveyed within the project limits, including inverts and top of lids. <br /> ii) Tree survey along the Phase 1 and Phase 2 waterline alignment, outside of the County project <br /> limits. All trees 9" and above shall be surveyed and tagged. <br /> iii) Locate two (2) bore holes. <br /> c) Easements field notes and sketches prepared with title commitments —6 permanent easements <br /> and 6 temporary construction easements. <br /> d) Record/As-Built drawing survey after construction is completed. This includes installed <br /> appurtenances and invert elevations. <br /> e) Deliverables: <br /> i) Topographic, boundary verification, and tree survey as Civil3D dwg. <br /> ii) Field notes for 30-foot temporary construction easements (6 total) and 20-foot permanent <br /> waterline easements (6 total). <br /> iii) Record/As-Built drawing survey. <br /> 3. Geotechnical Engineering <br /> The following geotechnical engineering services shall be conducted for the Project. The following <br /> geotechnical services shall be conducted for the Project: <br /> a) Perform Field Investigation— Up to two (2) borings will be completed: along the Phase 2 waterline <br /> alignment (up to 15-foot depth) and at the SH 21 trenchless crossing (up to 30-foot depth). Firm <br /> will be responsible for contacting the appropriate utility location services to have underground <br /> utilities located prior to drilling in the area. <br /> i) Soil borings will be properly backfilled with bentonite chips and a single lift of cold patch <br /> asphalt where applicable. The soil samples will be obtained using Shelby tubes and/or split- <br /> spoon samplers. Field testing of soil samples will include pocket penetrometer or Standard <br /> Penetration Test (SPT) in the cohesive soils and SPT in the cohesionless soils. <br /> ii) All field sampling and laboratory tests will be performed according to typical geotechnical <br /> standards or with other well-established procedures. Firm will perform appropriate <br /> laboratory tests on soil samples recovered from the borings. Laboratory testing may include <br /> moisture content, liquid limit, plastic limit, sulfate content, organic content, compaction, <br /> California Bearing Ratio (CBR) and particle size analysis tests. <br /> b) Firm will be responsible for avoiding conflicts with utility facilities by contacting the Texas One <br /> Call facility (Texas811). <br /> c) Provide geotechnical analysis and recommendations needed for utility excavation and backfill. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.