Laserfiche WebLink
Docusign Envelope ID: B4237C90-FBOF-82E3-836F-A5CFD2F500AA <br /> C42 North Side 12 In Water Connection aka William Pettus Extension City of San Marcos <br /> Engineering Design Services Exhibit B <br /> Services to be Provided by the Engineer <br /> d) Provide geotechnical analysis and recommendations needed for trenchless construction. <br /> e) Provide a Geotechnical Design Memorandum including the following items: <br /> i) Soil boring locations (Plan of borings) <br /> ii) Boring logs <br /> iii) Geological map(s) <br /> iv) Field and laboratory test results <br /> v) Description of subsurface conditions <br /> vi) Groundwater conditions <br /> vii) PVR calculations <br /> viii) Utility excavation and backfill recommendations <br /> ix) Trenchless construction recommendations <br /> f) Deliverables: <br /> i) Geotechnical Memorandum in pdf format. <br /> III. Bid Phase Services <br /> 1. Meetings <br /> a) Pre-Bid Meeting—BGE will attend and answer any questions for both Phase 1 and Phase 2. <br /> County staff will prepare the agenda and run the meeting for Phase 1. City staff will prepare the <br /> agenda and run the meeting for Phase 2. <br /> b) Monthly Project Meetings: It is assumed that each Project Bid Phase will occur over a 3-month <br /> period with a monthly 1-hour virtual project meeting with City staff,for a total of 6 meetings, held <br /> via MS Teams. <br /> 2. RFIs and Addendums <br /> a) For each phase, it is assumed that BGE will respond to up to five (5)total RFIs. <br /> b) For each phase, it is assumed that BGE will prepare up to one (1)addendum for each phase. <br /> 3. Bid Review <br /> a) BGE will provide a bid tabulation of submitted bids for Phase 2 of the Project. <br /> b) BGE will perform a reference check for bid qualifications and provide a recommendation of award <br /> for Phase 2 of the project. <br /> i) BGE will verify references for the top 3 bidders. <br /> 4. Conformed Plans and Specifications <br /> a) BGE will prepare conformed construction plans and specifications for Phase 1 and Phase 2. <br /> 5. Deliverables <br /> a) Letter of recommendation for Phase 2 of the Project. <br /> b) Conformed Plans for Phase 1 and Phase 2— 1 pdf, 1 dwg, 2-22"x34"sets, 4-11"x17"sets <br /> IV. Construction Phase Services <br /> 1. Meetings <br /> a) Pre-Construction Meeting <br /> i) Phase 1: BGE will attend and answer any questions. County staff will prepare the agenda and <br /> run the meeting. <br /> 8 <br />