My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2008-088
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2008
>
Res 2008-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2008 3:41:36 PM
Creation date
7/17/2008 8:15:50 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2008-88
Date
6/17/2008
Volume Book
176
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.2.4 Propose up to two (2) alternate alignments of new bicycle and pedestrian facilities based <br />on discussions with the City and TxState to connect existing facilities on eastern and western <br />ends of Sessom. Facilities will be designed to meet AASHTO and Americans with Disabilities <br />Act ("ADA") requirements. <br />1.2.5 Perform a drainage analysis that will analyze a drainage flood study prepared for the City <br />by Espey Engineers, and incorporate applicable elements into design. <br />1.2.6 Perform a hydrologic analysis for the existing roadway elements to include: <br />a) Determining drainage area boundaries for inlets, ditches and culverts; <br />b) Calculating runoff to each drainage element and preparing drainage area maps; and <br />c) Preparing drainage area maps. <br />1.2.7 Perform a hydraulic analysis for drainage elements to include: <br />a) Hydraulic design for each drainage element to determine if capacity is adequate; and <br />b) Determination of requirements for each element to improve capacity to capture flow. <br />1.2.8 Summarize required improvements to each drainage element and calculate the cost for <br />improvements. In addition, the Engineer will prepare a summary to include in the Preliminary <br />Design Report ("PDR") for recommended improvements. <br />1.2.9 Review outfall issues related to the San Marcos River and the Edwards Aquifer as <br />required. This task will be coordinated with environmental review of the Project. <br />1.2.10 Perform an intersection analysis at Peques Street and Sessoms to include: <br />a) Observation of existing traffic operations at the intersection of Peques Street and <br />Sessom; <br />b) Notations of operational problems, traffic patterns, parking, etc; <br />c) Perform turning movement counts in the AM (7-9 AM) and PM (4-6 PM) at the <br />intersection to document existing traffic data; <br />d) Perform capacity analysis and provide recommendations to improve level of service <br />and intersection operations; and <br />e) Perform bicycle/pedestrian analysis of proposed improvements. <br />1.2.11 Provide preliminary utility coordination to include: <br />a) Identification of utility companies from visual markers and request as-builts from <br />utility providers to locate utilities; <br />b) Identification of potential conflicts during preliminary design of drainage <br />improvements, intersection realignment, and spot repair improvements. <br />KBR-Sessom Drive Roadway Improvements Agreement <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.