Laserfiche WebLink
<br />CITY OF SAN MARCOS <br />DISTRIBUTIOW LINE EXTENSION POLICY <br /> <br />6. <br /> <br />EXCESS CONSTRUCTION COST DETERMINATION - When a line exten- <br />sion for electric service exceeds the maximum length pro- <br />vided as a standard by the City, the customer will be re- <br />quired to pay the City, in advance of any construction of <br />the extension, an amount to be determined as follows: <br /> <br />The required length of the extension shall be <br />established by a field survey performed by <br />the City. The total length of the extension <br />will be reduced by the maximum allowed for <br />the type of service to obtain the excess con- <br />struction required stated in feet. The num- <br />ber of feet of excess construction will then <br />be multiplied by the ci ty' s Standard Cons- <br />truction Cost for the type of extension re- <br />quired to obtain the amount of the required <br />payment. <br /> <br />Where it can be demonstrated that the expected annual reve- <br />nues (derived from base rates, exclusive of fuel) to be paid <br />by the prospective customer will generate the required mar- <br />gins to cover the total cost of constructing the extension, <br />disregarding any allowance; the City may, at its option, ex- <br />tend service without an excess construction cost payment by <br />the customer. <br />