My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 1987-129
San-Marcos
>
City Clerk
>
02 Ordinances
>
1980 s
>
1987
>
Ord 1987-129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2008 8:52:17 AM
Creation date
7/17/2008 8:52:17 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Code of Ordinances
Number
1987-129
Date
9/28/1987
Volume Book
89
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CITY OF SAN MARCOS <br />DISTRIBUTION LINE EXTENSION POLICY <br /> <br />APPENDIX F <br /> <br />SPECIAL FACILITIES <br /> <br />The city will extend only those facilities which are deemed <br />necessary to render service in accordance with the Tariff <br />schedules. Where a customer requires facilities which are <br />in addition to, or in substitution for, the standard facili- <br />ties which the City would normally install, the extra cost <br />thereof shall be paid by the customer. <br /> <br />NON-STANDARD AND CUSTOMER CONVENIENCE SERVICE - The customer <br />shall pay for any special installation necessary to meet a <br />particular requirement for service other than that normally <br />provided. Alternate voltage levels, tight voltage regula- <br />tion, minimum line noise, and other special requirements <br />shall be the responsibility of the customer. The customer <br />may be required to share in a portion of the estimated con- <br />struction cost for extending a service where such service is <br />not normally provided, or for additional meter or transfor- <br />mer installations to provide separate electric service such <br />as to x-ray machines. <br /> <br />INTERMITTENT LOADS - The City reserves the right to require <br />that the customer furnish and install any suitable or spe- <br />cial equipment necessary to reasonably limit the adverse <br />effects created by customer-owned equipment such as process <br />furnaces, arc welders, resistance welders, and large motors. <br /> <br />EXCESS CONSTRUCTION COST DETERMINATION - In a situation <br />where a customer requires electrical facilities in excess of <br />that normally furnished by the City, the customer may be re- <br />quired to pay the ci ty for the excess construction cost. <br />The City, at its sole option, may reduce such payment when <br />the estimated annual revenues (derived from base rates, <br />exclusive the fuel) anticipated from the proposed facility <br />generate the required margins to cover the total cost of <br />constructing the requested facilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.