Laserfiche WebLink
<br />SAN MARCOS ELECTRIC UTILITY <br /> <br />ELECTRIC TARIFF <br /> <br />ISSUED BY: <br /> <br />CITY OF SAN MARCOS, TEXAS <br /> <br />SHEET NO. <br /> <br />EFFECTIVE DATE: <br /> <br />REVISION NO. <br /> <br />MEDIUM GENERAL SERVICE <br />RATE SCHEDULE - MGS <br /> <br />The City shall charge and collect for medium general service <br />electric service on the basis of the provisions of this Rate <br />Schedule - MGS. The Power Cost Adjustment Clause and Rules and <br />Regulations for Electric Service are incorporated by reference as <br />a part of this rate schedule. <br /> <br />AVAILABILITY <br /> <br />This rate schedule is available throughout the entire terri- <br />tory served by the City of San Marcos. <br /> <br />APPLICABILITY <br /> <br />This rate schedule is applicable to all electric service <br />required for lighting, power and any other purpose, other than <br />residential service as defined in Rate Schedule - RS, where the <br />maximum metered demand in any month is 50 kW or greater but less <br />than 500 kW for which no specific rate schedule is available. <br /> <br />CHARACTER OF SERVICE <br /> <br />Service under this rate schedule shall be alternating cur- <br />rent, 60 Hertz, single or three phase, at the City's option of <br />standard available voltages. Standby or resale service is not <br />permitted under this rate schedule. <br /> <br />MONTHLY RATE <br /> <br />Customer Charge: <br />Single or Three Phase Service......$45.00 <br /> <br />Demand Charge: <br />All kW of Billing Demand...........$ 7.40 per kW <br /> <br />Energy Charge: <br />All kWh............................ $ 0 . 02479 per kWh <br />