My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2010-026
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2010
>
Res 2010-026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2010 9:36:52 AM
Creation date
2/22/2010 10:04:15 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2010-26
Date
2/16/2010
Volume Book
185
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.0.4 The Engineer will not subcontract any of the work under this Agreement without prior <br />written approval from the City. Any work or services subcontracted under this Agreement will <br />be specified by separate written Agreement and will be subject to each provision of this <br />Agreement. <br />1.0.5 Any provisions in this Agreement pertaining to the City's review, approval and/or <br />acceptance of written materials prepared by the Engineer and/or its subconsultants, contractors, <br />and subcontractors in connection with this Agreement will not diminish the Engineer's <br />responsibility for the materials. <br />1.0.6 The Engineer will perform all of its services in coordination with the City. The Engineer <br />will advise the City of data and information the Engineer needs to perform its services and the <br />Engineer will meet with City representatives at mutually convenient times to assemble this data <br />and information. <br />1.0.7 Chris Quigley, Phd., PE, is the Engineer's Project Representative assigned to this Project. <br />The Engineer will not substitute another representative unless approved in writing by the City in <br />advance of such proposed substitution. In the event the City and the Engineer cannot agree to <br />the substitution of the Project Representative, the City may terminate this Agreement in <br />accordance with Article 7. <br />1.1 TASK 1- PROJECT MANAGEMENT <br />The Engineer will: <br />1.1.1 Manage Project staff and resources in order to meet Project schedules and deliverables in <br />a timely manner. <br />1.1.2 Conduct a Project kick-off meeting and monthly Project meetings for the duration of the <br />Project. The Engineer will be responsible for recording minutes of meetings, preparing monthly <br />progress reports, and Quality Assurance/Quality Control ("QA/QC"). <br />1.1.3 Conduct a Site Evaluation Criteria Workshop to review site evaluation criteria and the <br />relative weightings to be used during site ranking. The Engineer will endeavor to include public <br />involvement during this workshop. <br />1.1.4 Prepare for and present to City Council the Project findings and recommendations on a <br />date to be determined by the City. <br />1.1.5 Provide the City with electronic copies of the following deliverables: <br />a) Meeting minutes; <br />b) Monthly progress meeting minutes; <br />c) Monthly progress report <br />d) Results of the Site Evaluation Criteria Workshop; and <br />e) Presentation to City Council. <br />W W WTP Site Location Assessment - CH2M Hill <br />2
The URL can be used to link to this page
Your browser does not support the video tag.