Laserfiche WebLink
<br />growth, expansion and needs of the City. The studies to'be <br /> <br /> <br />made by Engineers shall include, among other thingsl <br /> <br /> <br />(a) A study and review of the existing sanitary sewer <br /> <br />~,. <br />:} C49 <br /> <br />system, including such field measurement by Engineers <br /> <br />I <br /> <br />of selected typical areas within the existing sewer <br />system as is necessary to determine, within the limits <br />set forth above, the approximate characteristics and <br />ranges of sewage flow to the plant. <br />(b) A study of the present sewage treatment plant to <br />determine the capacity of the plant and the improvements <br />necessary thereto in order to treat the volume and <br />strength of sewage which presently exists and will <br /> <br />result from an expanded system. <br />(c) The incorporation of all findings, recommendations, <br /> <br />programming of improvements recommended, construction <br /> <br />cost estimates, and other material, in connection with <br /> <br />this project, in a complete, bound report (herein sometimes <br /> <br />referred to as the Preliminary Report) illustrated with <br /> <br />I <br /> <br />charts, maps, sketches, drawings, and other explanatory <br />material, in order that the recommendations may be <br /> <br />readily understood, and personally delivering the report <br /> <br />in sufficient copies to the City within the time for <br /> <br />completion of the Preliminary Phase, which time is here- <br /> <br />inafter fixed in this contract. <br /> <br />I <br /> <br />(d) Consultation with City officials, the State Depart- <br />ment of Health, the U. S. Public Health Service and any <br />other State or Federal agency or agencies having a <br />regulatory or financial interest in the project to the <br />end that the recommendations contained in the report shall <br />be in accord and compliance with their requirements. <br />(e) The PRELIMINARY PHASE of this project shall not be <br /> <br />commenced by Engineers until and unless City gives Engi- <br />neers written notice to proceed with such work; and, after <br />such notice has been given by City, the PRELIMINARY <br /> <br />PHASE shall be completed by Engineers within sixty (60) <br /> <br />days after City has given such notice to Engineers. <br />