My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05131958 Regular Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
1950 s
>
1958
>
05131958 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2008 2:49:46 PM
Creation date
6/23/2008 11:07:07 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Regular Meeting
Date
5/13/1958
Volume Book
22
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />the City may be advised as to the anticipated <br /> <br />~jjH <br />l'- <br />,. ,.,...3 <br />const;. i, j <br /> <br />ruction costs of the authorized portions of the project; <br /> <br />and <br /> <br />(b) To assist the City to secure competitive bids <br /> <br />by reliable contractors, to be present when the bids are <br /> <br /> <br />opened, to analyze the bids submitted and to recommend <br /> <br />I <br /> <br />as to award of contracts; and <br /> <br />(c) To check all shop drawings, reinforcing steel, <br /> <br />structural steel, and other construction materials to <br /> <br />the end that the construction is in complete accordance <br /> <br />with the plans and specifications; and <br /> <br />(d) Approve all equipment offered by the contractor <br /> <br />to determine if it meets with the specifications, <br /> <br />requirements and needs of the City and is in accordance <br /> <br />with the specifications. <br /> <br />C. CONSTRUCTION PHASE <br /> <br />(1) Upon written authorization from City to begin const- <br /> <br />ruction, the Engineers shall stake out all work, establish grades, <br /> <br />I <br /> <br />and check to see that the interest of the City is protected; <br /> <br />and <br /> <br />(2) Check all monthly estimates and make regular reports <br /> <br />to the City as to progress; and <br /> <br />(3) Make final inspection, check all construction, and <br /> <br />report to the City as to the acceptance of the work; and <br /> <br />(4) To make "as built" plans and drawings of the work <br /> <br />constructed and furnish'a set of reproducible drawings to <br /> <br />the City for their record. <br /> <br />o. <br /> <br />A. For the services and materials to be furnished by the <br /> <br />Engineers hereunder, the City agrees to pay, and Engineers agree <br /> <br />I <br /> <br />to accept, a fee equal to nine per cent (9%) of the construction <br /> <br />cost of the work designed by the Engineers. The sum of $1,000.00 <br />to be paid for the PRELIMINARY PHASE of the work shall be construed <br /> <br />to be a part of the said fee, and is not in addition to said fee. <br /> <br />B. The fee due to Engineers hereunder (exclusive of the fixed <br /> <br />fee for the Preliminary Phase) shall be payable in installments. <br /> <br />The first installment, for a sum of money equal to seventy-five <br /> <br />per cent (70%) of the total fee of the Engineers, less the $1,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.