Laserfiche WebLink
<br />",'- <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />III <br /> <br />Hon. Mayor & City Council <br /> <br />-2- <br /> <br />July 14, 1967 <br /> <br />specifically authorized by the City. <br /> <br />We estimate that the cost of the additional preliminary <br />engineering that will be required to complete the report as <br />called for by the application will be about $700.00. <br /> <br />We shall endeavor to ~eeJ the total costs below $700.00. <br />As an example, we will not request payment for material that <br />can be utilized from your previous engineering study, data that <br />we would nor~ally furn~sh as part of our design work, or for <br />information in our files that we have previously developed in <br />connection with other Federal applications filed by the City. <br />We consider the $700.00 estimate to C:Je an "'outside" figure, <br />to give you an idea of the possible maximum costs. <br /> <br />We shall cOIDnlete our work as soon as possible after <br />receipt of your authorization to proceed. <br /> <br />Sincerely, <br /> <br />Ii; /: <br /> <br />Bill W. Klotz <br />Vice President <br /> <br />BWKjwjb <br /> <br />// <br /> <br />cc: Mrs. Dorothy Worrell <br />