Laserfiche WebLink
<br />of the collection of appropriate information and data about the <br />Airport and the adjacent Camp G8ry. This will be accomplished <br />by detailed review of all historical information, transfer <br />documents deedin~ the property to the City, end all other data <br />including current leases and other negotiations which heve taken <br />place. <br /> <br />In regard to Camp Gary, it is only intended to review their <br />land holdin~, their need for such land and whether there may <br />be opportunity in the future to obtain such land for airport <br />purposes. Concurrent with this, a general review will be made <br />of some of the buildings held by them, and whether these <br />buildings might become surplus to their needs and be utilized <br />for use which would . produce revenue to support and maintain <br />the Airport. <br /> <br />I <br /> <br />This will require the holding of a series of meetings with <br />Airport COl!Lmission members, contract officials of Camp Gary, <br />interested influential members of the community and with City <br />and County officials. <br /> <br />FORECAST OF AVIATION DEI.IAND. The Consultant will, with the help <br />of Airport Commission members, determine through forecasts or <br />evaluation of currently available and acceptable information, <br />the forecast of aviation demand by type of aircraft for San <br />Marcos Municipal Airport. Analysis of existing Airport operation, <br />social,economic, environmental and technical factors will be <br />used in aviation demand forecast. <br /> <br />DEMAND/CAPACITY/ANALYSIS. A broad based analysis of all related <br />factors forecast for planning period will be compared with the <br />capacity of the existing facilities, particularly on the build- <br />ing side of the Airport. Any difference will serve to alert <br />for action to obtain more land from the Dept. of Labor. <br /> <br />I <br /> <br />Although plannin~ of this Airport for pOSSible airline usage <br />by the adjacent metropolitan area is not the responsibility of <br />San IfJarcos, the analysis will include whether feasible expansion <br />of this Airport is possible, and the direction that such ex- <br />pans ion would take. This ,-Ioul'l prov ide informat ion to loca 1 <br />officials to deal with officials from the metropolitan area. <br /> <br />AIRPORT LAYOUT PLAN. The Airport Layout Plan is a group ofdrewings <br />appropriate scale which present graphically all of the existing .- <br />facilities, those proposed and the ultimate possibilities for at <br />least 20 years. It will include a primary draWing on 1" equals <br />500' to show runway, taxiway, apron, clear zones (both existinz <br />and future), which, although too small a scale to be dimensioned <br />and used, will show an overall view of the Airport as it will <br />look in the future. <br /> <br />Additional draWings on a much larger scale will be included to <br />show details of all facilities complete with dimensions that can <br />be used for facilities actually constructed. This series of <br />drawings will be prepared only after all of the hearine;s and in- <br />vestigations have been conducted and there is overall agreement <br /> <br />2 <br />